Similar Projects
RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

RFQ Design - Chehalis River Sediment Wedge
Infrastructure
Conception
$800,000 CJ est. value
Central Park, WA 98520

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Design
$7,500,000 CJ est. value
Bellevue, WA 98005

Little Goose DC System and LV Switchgear Upgrades
Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Starbuck, WA 99359

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Bidding
$10,000,000 CJ est. value
Stehekin, WA 98852

FY22 Neah Bay Dredging
Infrastructure
Bidding
$5,000,000 CJ est. value
Neah Bay, WA 98357

South Puget Sound WLA Turtle Fence Rebid
Infrastructure
Sub-Bidding
$235,000 CJ est. value
Tumwater, WA 98512

City Line Railing Panels
Infrastructure
Sub-Bidding
$190,000 CJ est. value
Spokane, WA 99201

Fishers Landing Employee Area and Rose Besserman Room Refresh Project
Infrastructure
Post-Bid
Vancouver, WA 98683

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Weatherization - Stick Built 8539
Alteration
Results
Less than $50,000 est. value
Puyallup, WA

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Results
Less than $300,000 est. value
Spokane, WA 99202

RFQ Engineering - Fort Dent Repairs Project
Infrastructure
Pending Verification
$692,119 CJ est. value
Issaquah, WA 98029

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

Parking Area Reconstruction
Infrastructure
Design
$1,300,000 CJ est. value
White Salmon, WA 98672

Last Updated 08/06/2022 08:33 AM
Project Title

South Sound Net Pen Removal

Physical Address View project details and contacts
City, State (County) Lake Cushman, WA 98548   (Mason County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Dock/Pier/Marine, Environmental, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $55,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, material, equipment, and permits to remove and properly dispose of the South Sound Net Pens located in Peale Passage at 47.200450, -122.904213. Washington State, in Mason County. Due to the safety and health of the public and employees WDFW CAMP is temporarily closing Bid Openings to public attendance. Bid opening results will be made public within 24 hours of opening. No pre-bid walkthrough is scheduled, Contractors are strongly encouraged to independently visit the site. For information or technical questions regarding this project, email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line. This email may also be used to request copies of the projects posted documents (Drawings, Specifications, Addenda). Minority and Womens Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. Bid Bond: For bids of $35,000 or less, no bid guarantee is required. Bids greater than $35,000 shall be accompanied by a certified check, cashiers check, or bid bond payable to the Treasurer of the State of Washington in an amount equal to at least five-percent of the bid as evidence of good faith and as a guarantee that, if awarded the Contract, the bidder will execute the Contract and give separate bond as required, see Section 00702.06. Base bids greater than $150,000; Contractor shall provide separate Payment and Performance Bonds, each executed by Contractor and Contractors Surety. Base bids $150,000 or less, Contractor shall provide separate Payment and Performance Bonds, each executed by Contractor and Contractors Surety, unless the Contractor agrees Owner may, in lieu of the bond(s), retain 10 percent of the Contract Sum for the period allowed by RCW 39.08.010 he undersigned agrees to pay the Owner as liquidated damages the sum of $550 for each consecutive calendar day that is in default after the Contract Time. Liquidated damages shall be deducted from the Contract by Change Order

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents