Similar Projects
Trout of Paradise Pavilion
New Construction - 1,000 SF
Conception
Less than $500,000 CJ est. value
Paradise, UT 84328

Reach Higher Performance Center
New Construction - 28,783 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84770

Y--Three Peaks SRMA Redevelopment
New Construction
Design
$500,000 to $1,000,000 est. value
Cedar City, UT

Little Valley Pickleball Court Resurfacing Phase 2
New Construction
Bidding
Saint George, UT 84790

Tennis Courts Resurface
Renovation
Bidding
Salt Lake City, UT

Kay's Creek / D and RGW Trailhead
Post-Bid
Less than $100,000 est. value
Layton, UT 84041

Sunnyvale Park Improvements
Post-Bid
$300,000 to $400,000 est. value
Millcreek, UT

Lakeview Parkway-Phase I
Results
Provo, UT

Willow Creek Park Court Resurfacing
Results
Park City, UT 84098

Orem YSA Pavilion
New Construction
Construction
Orem, UT 84957

The Family Place Pavilion Paver Project
New Construction
Construction
Logan, UT 84341

Stephens South Weber
New Construction - 47,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
South Weber, UT

Taylorsville Mixed Use
New Construction - 40,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Taylorsville, UT

Seasons Amenities
New Construction - 1,660 SF
Design
$500,000 to $1,000,000 CJ est. value
Garden City, UT 84028

Spanish Fork City`s All Ability Park
Post-Bid
Spanish Fork, UT 84660

Last Updated 07/12/2021 03:07 AM
Project Title

DFCM Construction - DNR/BOR Echo State Park Renovation Phase II

Physical Address View project details and contacts
City, State (County) Coalville, UT 84017   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,382,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is Phase II of improvements to Echo State Park. Existing buildings and bathrooms will be removed and the ground will be leveled and regraded for paved boat and day use parking. A new 11-cabin camping area will be constructed. New buildings, including a fee station will be constructed as well as a new entrance to improve safety entering and exiting the park. Work will include the design and construction of a new water tank and construction of the water distribution system. An extensive sewer system will also be constructed. A dump station near Coalville City will be built with water and sewer connections.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents