Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Downtown Doral PS0014 Reconstruction Sanitary Sewage Pump Station
Results
Less than $2,569,209 est. value
Doral, FL 33174

Last Updated 01/05/2021 11:52 AM
Project Title

Pump Station F Renovations

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33146   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $370,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all materials, labor, and equipment necessary to upgrade Pump Station “F”, which includes but is not limited to the following items: providing uninterrupted bypass pumping capabilities with a temporary bypass connection for the pump station peak flow during all construction operations and until the new pump station is completely operation and accepted by the Owner; demolition of the existing one-story building housing the stand-by generator, automatic transfer switch, main disconnect and other associated electrical equipment located inside; demolishing of the control panel, including instrumentation, hardware, appurtenances, conduits, and all other items deemed necessary to be removed for the successful installation of the new proposed pump station equipment; contractor shall maintain the site clear of construction and demolition material and debris, including asphalt pavement, concrete pavement, unsuitable and excess backfill materials, pipes and valves, and discarded electrical and mechanical equipment. Contractor must provide transportation and legal disposal of all discarded material

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents