Similar Projects
ACTIV Apartments at Southwest Plaza
New Construction
Conception
$108,000,000 est. value
Littleton, CO 80123

Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County
Infrastructure
Conception
$3,053,510 est. value
Broomfield, CO 80021

Clear Creek Commons
New Construction - 223,460 SF
Design
$10,000,000 CJ est. value
Arvada, CO 80002

Ralston Commons
New Construction - 11,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Arvada, CO 80002

Staunton SP - Archery Range Shade Shelters
New Construction, Infrastructure
Bidding
$120,000 CJ est. value
Pine, CO 80470

RFP Construction Manager - ITS Maintenance Yard - Arvada Project and Coal Creek Project CMGC
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Arvada, CO 80003

Traffic Signal Replacement, Curb Ramps, Pavement Markings
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Lakewood, CO 80226

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Ralston Road - Yukon Street to Garrison Street
Results
Arvada, CO 80001

Jay Street Apartments
New Construction - 28,212 SF
Construction
$5,800,000 est. value
Lakewood, CO 80214

Dry Gulch Commons
New Construction - 60,000 SF
Construction
$5,000,000 est. value
Lakewood, CO 80214

Belmar Plaza Apartments
New Construction - 382,000 SF
Pending Verification
$70,000,000 est. value
Lakewood, CO 80226

Rainbow Hill Road Hotel and Commercial
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Evergreen, CO 80439

Last Updated 08/10/2022 01:09 PM
Project Title

The Lock at Flatiron

Physical Address View project details and contacts
City, State (County) Broomfield, CO 80021   (Jefferson County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of an apartment complex. Amenities will include a fitness center, pool, and rooftop lounge. As of June 15, 2022, this project is under construction. A ground breaking took place on June 13, 2022. A general contractor and architect has been selected. Construction began in December of 2021 and should be completed second quarter of 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1,425 SF Apartments, 261 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Tubs and Pools, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents