Similar Projects
Cth Z - Sth 78 Const/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
New Richmond, WI 54017

Cth Z - Sth 78 Const/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
New Richmond, WI 54017

3rd Street/Laurel Avenue Bluff Area Reconstruction Project
Infrastructure
Design
$924,392 CJ est. value
Hudson, WI 54016

3rd Street/Laurel Avenue Bluff Area Reconstruction Project
Infrastructure
Design
$924,392 CJ est. value
Hudson, WI 54016

Road Work Bid
Infrastructure
Post-Bid
Forest, WI

Storm Damage Repair
Infrastructure
Post-Bid
Hudson, WI

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Hudson Medical Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$50,000,000 CJ est. value
Hudson, WI 54016

Hudson Medical Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$50,000,000 CJ est. value
Hudson, WI 54016

2022 Curb and Sidewalk Repairs
Infrastructure
Design
$180,000 CJ est. value
Somerset, WI 54025

Various Construction Season Materials/Services
Infrastructure
Post-Bid
Baldwin, WI

Mary Park Fishing Pier
Results
New Richmond, WI 54017

Last Updated 09/08/2022 03:58 PM
Project Title

RFQ Engineering - Concrete Surface Repair

Physical Address View project details and contacts
City, State (County) Somerset, WI 54025   (Saint Croix County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Solicitation No. NW-04 Project Limits : 150TH AVE TO CTH C County : St Croix The primary need for the project is to repair the concrete roadway surface. Secondary needs are to resurface the asphalt shoulders. The proposed rehabilitation improvement consists of concrete pavement repair and replacement work. Also includes centerline repair, asphalt resurfacing of shoulders, culverts, replacing all type 1 signs, pavement markings and shoulder rumble strips. The work will be done under traffic utilizing single-lane closures. 8080-08-05 - This project has 6.51 miles associated with it. Location is STH 35, 150th Ave to CTH C, St. Croix County 8110-00-09 - This project has 6.689 miles associated with it. Location is STH 64, STH 35 to 142nd St, St. Croix County Anticipated Construction Cost $5,000,000-$5,999,999 The contract price will be based on the selected consultants actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). ; Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at website. Advertised Fixed Fee % 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Do not include any information that meets the definition of trade secret as that term is defined in s. 134.90(1)(c), Wis. Stats. Interview : No WisDOT - RFQ Engineering - Concrete Surface Repair As of February 23, 2021, a design firm has been selected. A bid schedule for contractors has not been released. A construction timeline has not been disclosed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents