Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

2021 HVAC Improvements Project
Renovation
Sub-Bidding
$480,000 CJ est. value
Madison, WI 53713

Wastewater Treatment Plant Boiler and System Update
Renovation
Sub-Bidding
$300,000 CJ est. value
Antigo, WI 54409

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Jail Cooling Tower Replacement
Results
Portage, WI 53901

Administration Building Heat Pump Replacement Phase 3
Results
Kenosha, WI 53140

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

City Hall Boiler Replacement
Renovation
Sub-Bidding
$60,000 CJ est. value
De Pere, WI 54115

Remodeling of the Forest County Courthouse
Alteration
Post-Bid
Crandon, WI 54520

Replacing the HVAC Pneumatic Compressor
Results
Darlington, WI 53530

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Clinton Rose Senior Center Second Boiler Install and Exhaust Fans Replacement and Mcgovern Senior Center Exhaust Fans Replacement
Results
Milwaukee, WI 53212

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

Last Updated 12/02/2022 03:34 PM
Project Title

Northstar Middle School Chiller, Boiler Replacement and Longfellow Elementary School Condensing Unit Replacement

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $667,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Northstar Middle School, Chiller Replacement, Northstar Middle School, Boiler Replacement, and Longfellow Elementary School Condensing Unit Replacement Projects. All questions regarding the bidding procedures, design, and scope of work should be directed to: Jeff Nestor, ECASD - Phone number: 715-579-9505 or Email: jnestor@ecasd.us All individual and combined Lump sum bid proposals with 100% performance bond and 5% bond security are required. Bids may not be withdrawn for a period of thirty (30) days after the bid due date. Sealed bids identified as "Northstar Middle School Chiller Replacement, Northstar Middle School Boiler Replacement, and Longfellow Elementary School Condensing Unit Replacement" may be mailed or hand-delivered to: Jeff Nestor, Facilities Planning Manager, ECASD, at 623 North Hastings Way, Eau Claire, WI 54703. The Eau Claire Area School District reserves the right to reject all proposals not deemed in the best interest of the school district.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents