Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Diversion Facility Upgrades
Renovation
Design
$470,000 CJ est. value
Pacific House, CA 95726

Beale Fuel Hydrant Replacement
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Beale AFB, CA 95903

Channel Force Main Intertie
Infrastructure
Bidding
$16,000,000 CJ est. value
San Francisco, CA 94103

Utilities Water and Wastewater Generator Replacement Project
Renovation
Sub-Bidding
$231,000 CJ est. value
Morgan Hill, CA 95037

Switchgear Rehabilitation Project
Renovation
Sub-Bidding
$12,200,000 CJ est. value
Hayward, CA 94545

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

P-Site Road Repairs
Infrastructure
Bidding
$250,000 CJ est. value
Middletown, CA 95461

Last Updated 08/11/2022 10:24 AM
Project Title

Lift Stations 1, 2 and 30 Improvements Project

Physical Address View project details and contacts
City, State (County) Oxnard, CA 93030   (Ventura County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,989,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As more specifically described in the Contract Documents, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace mechanical equipment, force main, and coating for lift station 1, replace mechanical equipment, add a meter, and coating for lift station 2, and add a meter to lift station 3. Project Duration: 180 Work Days Liquidated Damages: $1,250.00 Per Calendar Day Bid Bond Percentage: 10% Pre-Qualification for Bidders: Not Required License Type Required: A

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents