Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 03/25/2020 04:19 PM
Project Title

Ulysses Town Hall HVAC Replacement

Physical Address View project details and contacts
City, State (County) Trumansburg, NY 14886   (Tompkins County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $95,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical Electrical The project will upgrade the old HVAC systems with energy efficient variable refrigerant flow (VRF) and provide ventilation through new energy recovery ventilators. The Town is seeking proposals to install heat pumps for heating, cooling, moisture control and for an ERV ventilation system. Scope includes the installation of (2) heat pumps with a total of (12) fan coil units in the offices, court and corridor, installation of (2) ERV with duct work, and an electrical service upgrade from a 150A service to a 225A service. Work includes all mechanical, electrical, and general work (cutting and patching to match existing). Existing heating and cooling system shall remain in place as a backup system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents