Similar Projects
Water Treatment Plant No. 2 and Well No. 3
New Construction
Bidding
Pingree Grove, IL

Du Quoin Clarifier Rehabilitation
Renovation
Bidding
$85,000 est. value
Du Quoin, IL

Wastewater Treatment Facility - Phase 2A Rehabilitation
New Construction, Infrastructure
Sub-Bidding
Batavia, IL

WPCF Digester Rehabilitation
Post-Bid
Glendale Heights, IL 60139

Water Treatment Program
Term Contract
Post-Bid
Glen Ellyn, IL 60137

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

Water Reclamation Facility Phase 2B Improvements
Results
$8,100,000 est. value
Bloomingdale, IL 60108

Design-Build Services for South Slope WWTP Controls Improvements
Renovation
Post-Bid
Moline, IL 61265

Water Treatment Plant Filter Recoating and Media Replacement
Results
Less than $648,110 est. value
Effingham, IL

Digester Rehabilitation
Renovation
Post-Bid
Glendale Heights, IL 60139

Southern Illinois University - Edwardsville, Madison County Improve Water Treatment Plant Sand Filter
Results
Less than $900,000 est. value
Edwardsville, IL 62026

Argonne Utilities Upgrades (Au2) Phase 1 Design
New Construction - 50,000 SF
Post-Bid
$95,000,000 to $105,000,000 est. value
IL

Water Treatment Plant Filter Rehabilitation
Results
Quincy, IL 62301

Wastewater Treatment Facility Disinfection Improvements
Renovation
Post-Bid
Mendota, IL 61342

GAC Filter Media Replacement
Renovation
Results
Elgin, IL 60120

Last Updated 12/21/2021 01:27 PM
Project Title

Well House & Iron Treatment Plant

Physical Address View project details and contacts
City, State (County) Rochelle, IL 61068   (Ogle County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Bidding Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Well 8 New Well House and Iron Treatment Plant Construct a new well house along with all associated equipment to replace an existing well and building. The new well house will be located at 1015 S Caron Rd. the design and layout will need to include an iron removal plant along with radium removal included in the design.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents