Similar Projects
HVAC Renovations: Building 70
Alteration
Bidding
Galloway, NJ 08205

Partial Roof Replacement at Egg Harbor Township High School
Alteration
Bidding
$950,000 est. value
Egg Harbor Township, NJ 08234

Providing Preventive Maintenance and Emergency Repairs On Atlantic County`s Chillers
Term Contract
Post-Bid
Atlantic City, NJ 08401

HVAC Maintenance Service Contract at the Belhaven Middle School and the Seaview Elementary School
Post-Bid
Linwood, NJ 08221

Remove and Replace HVAC/Furnace System at U.S. Coast Guard Absecon House
Results
Galloway, NJ 08205

On-Call HVAC Maintenance and Repairs
Results
Atlantic City, NJ 08401

Chiller Maintenance Service Contract at the Belhaven Middle School and the Seaview Elementary School
Post-Bid
Linwood, NJ 08221

HVAC and Building Mechanicals Maintenance Services National Aviation Research and Technology Park Building 3
Results
$17,820 est. value
Egg Harbor Township, NJ 08234

Maintenance and Repair to the (BMS) Building Management System (ATC) Automatic Temperature Control (ECC) Energy Conservation Control System for Atlantic County Buildings
Post-Bid
Atlantic City, NJ 08401

HVAC Contractor Services Repair and New Installation
Results
Atlantic City, NJ

HVAC and Mechanical Products
Term Contract
Post-Bid

Installation of Wall Mounted Replacement Air Conditioners/Heaters
Results
Buena Vista Township, NJ 08346

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Chiller Replacement at Jordan Road School
Results
Less than $135,000 est. value
Somers Point, NJ 08244

2021 HVAC Upgrades at Leeds Avenue School
Post-Bid
Pleasantville, NJ 08232

Last Updated 12/13/2021 04:39 PM
Project Title

Coil Replacement at Campus Center

Physical Address View project details and contacts
City, State (County) Galloway, NJ   (Atlantic County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing heating hot water and chilled water coils (procured directly by Stockton University) present in the roof-mounted make-up air unit serving the kitchen areas of the Campus Center building. Installation of four freeze-stats, Installation of a check valve in the heating hot water piping below the roofline near the existing freeze protection pump.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents