Similar Projects
Bradstreet's Landing Waterfront Improvements, Phase 2
Infrastructure
Post-Bid
$3,980,090 CJ est. value
Rocky River, OH 44116

Concrete Repair Products
Alteration
Post-Bid
Cleveland, OH

Water Reclamation Facility Concrete Repairs
Alteration
Results
$3,600,000 est. value
Cleveland, OH 44139

Annual Concrete Repair Program
Alteration
Results
Solon, OH

Olmsted Falls 2022 Concrete Program
Infrastructure
Post-Bid
$200,000 est. value
Olmsted Falls, OH

2022 Road Program - Concrete Repairs
Alteration
Results
Brecksville, OH

2022 Sidewalk Program
Infrastructure
Post-Bid
$183,250 CJ est. value
Mayfield Heights, OH 44124

2022 Road Program - Unscheduled Concrete Repairs
Alteration
Results
Brecksville, OH

Hawthorn Parkway Bridge Replacement at South Chagrin Reservation
Demolition, New Construction, Infrastructure
Post-Bid
$2,015,785 CJ est. value
Solon, OH 44139

2022 Road Program - Partial Depth Repairs, Concrete
Alteration
Results
Brecksville, OH

Asphalt Concrete Surface
Term Contract
Post-Bid
Cleveland, OH 44114

2022 Concrete Program
Alteration
Results
$200,000 est. value
Lyndhurst, OH

Concrete
Term Contract
Post-Bid
Cleveland, OH 44115

2022 Concrete Program
Alteration
Results
$400,000 est. value
Pepper Pike, OH

Boston Road (C.r. 127) Rehabilitation of Existing Bridge 07.45
Infrastructure
Post-Bid
$1,400,000 CJ est. value
Broadview Heights, OH 44147

Last Updated 03/03/2023 07:04 AM
Project Title

Culvert Replacement - SR 87

Physical Address View project details and contacts
City, State (County) Shaker Heights, OH 44122   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,296,769 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

OHDOT - Culvert Replacement - SR 87 - partially remove endwalls and portions of existing concrete arch structure. remove and replace portions of existing box cul vert. fill void between remaining portions of concrete arch and proposed cip box culvert with engineered fill. Contract ID: CUY21806 MBE (16.1%), WBE (6.9%) Date Set for Completion: 10/15/2023 Gas, Oil, Water Well Abandonments Roadway Excavation & Embankment Construction Heat Straightening Major Roadway Excavations Guardrail / Attenuators Pavement Planning, Milling, Scarification Apply Bituminous Treatments Rigid Pavement Replacement Structural Steel Painting Expansion & Contraction Joints, Joint sealers, Bearing Devices Railroad Track Construction Pavement Markings Sealing of Concrete Surfaces with Epoxy or NonEpoxy Sealers clearing and grubbing (wt: 01) pipe removed, 24" and under (wt: nr) pipe removed, over 24" (wt: nr) excavation (wt: 06) embankment (wt: 06) artial depth pavement repair (441), 3" (wt: 16) pavement planing, asphalt concrete, 1 1/2" (wt: 13) non-tracking tack coat (wt: 10) asphalt concrete surface course, type 1, (448), pg64-22,

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents