Similar Projects
Grade, Drain, Bridge and Surface
Renovation, Infrastructure
Design
$38,500,000 est. value
Tahlequah, OK 74464

Grade, Drain, Bridge and Surface
Infrastructure
Design
$40,000,000 CJ est. value
Tahlequah, OK 74464

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Design - Site Development - Pre-Construction Design Phase
Infrastructure
Bidding
$50,000 CJ est. value
Tahlequah, OK 74464

Briggs Public Schools Lower Gymnasium Renovation Rebid
Addition, Renovation, Infrastructure - 7,760 SF
Sub-Bidding
$1,500,000 CJ est. value
Tahlequah, OK 74464

4th Street Parking Lot Sealcoat and Re-Stripe
Infrastructure
Post-Bid
$300,000 CJ est. value
Tahlequah, OK 74464

4th Street Parking Lot Sealcoat and Re-Stripe
Infrastructure
Post-Bid
$300,000 CJ est. value
Tahlequah, OK 74464

Slabjacking and Subsealing Services
Infrastructure
Results

Blackgum Landing Road
Term Contract
Results
Cookson, Roland, OK

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

Utilities - SH 100
Infrastructure
Design
$2,000,000 CJ est. value
Cookson, OK 74427

Mission Park Trails
Infrastructure
Bidding
$125,000 CJ est. value
Tahlequah, OK 74464

Middle School Addition
Demolition, New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Tahlequah, OK 74464

Resurface (Asphalt) - SH-51
Infrastructure
Results
OK

Last Updated 02/15/2023 07:34 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) Tahlequah, OK 74464   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2027
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-82: Begin 1.4 Mi. North of Us-62/sh-51 Jct, North Approx 6.5 mi. As of February 15, 2023, the project is in Design status. Anticipated letting month/year is May, 2026. Length : 6.600 Mi. OKDOT - Resurface *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents