Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Amendment 0003 - Design Build Contract for the General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract—with Design-Build Capabilities—for the State of Georgia
Post-Bid
$1,000,000 to $5,000,000 est. value

Weatherization Contractors
Post-Bid

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Rockdale County Water Resources Convenience Center Renovations
Renovation
Results
Conyers, GA

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

South Atlantic Regional Construction IDIQ
Results
$50,000 to $80,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Reported 12/27/2019 04:20 PM
Project Title

Construction Manager at Risk - RCPS Central Office Complex

Physical Address View project details and contacts
City, State (County) Conyers, GA   (Rockdale County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method
Project Status Construction Commenced September 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction/renovation of the old Pine Street ES for the RCPS Central Office Complex, 960 Pine Street, Conyers, GA 30012 for the Rockdale County Board of Education (RCPS). At this time, it is anticipated that RCPS will contract with the selected firm for construction services for sitework and building construction. However, RCPS reserves the right to consider other contracting strategies at any time during this process. Construction services will include all elements related to site and building for the construction/renovation of the RCPS Central Office Complex, a conversion of the old Pine Street ES facility. The project will consist of approximately 55,000 square feet of new two-story construction and 30,000 square feet of renovation. Work will include, but is not limited to, site and a portion of the building demolition, site work, concrete flatwork and foundations, structural steel, masonry, metal stud and gypboard walls, exterior finishes, roofing, doors, windows,hardware, interior finishes, speciaties, cooler/freezer, kitchen equipment, plumbing, HVAC, fire protection, and electrical systems both power and low voltage. Schematic drawings of the floor plans for the project, a draft site improvement plan, and possibly exterior elevations will be provided to prospective contractors, prior to the required RFQ/RFP submittal date, upon request for same to the responsible Architect.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents