Similar Projects
WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Materials and Equipment for Well 21 Repair
Term Contract
Post-Bid
Luke Air Force Base, Peoria, AZ 85309

Valentine Well
Results
Phoenix, AZ 85027

Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Results
Gilbert, AZ 85297

Sewage Lift Pump
Term Contract
Post-Bid
Phoenix, AZ 85012

Chilled Water Pump
Results
Tempe, AZ 85283

Construction Project Drilling and Installation of the Pulte Rio Caballo Well No.1
Infrastructure
Post-Bid
Surprise, AZ 85387

Install A third (3rd) Chiller and Replace One (1) Chilled Water Pump with two (2) Chilled Water Pumps
Results
Tempe, AZ 85284

Tartesso Unit 3A Well No. 4 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

Upgrade Variable Frequency Drive for Domestic Water Pumps at Maricopa, AZ
Results
Maricopa, AZ 85138

Trillium Phase 1 Well #3 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

Brandenburg Ranger Station Phase II
Results
Phoenix, AZ

Replacement Well Drilling: City Well 9, Desert Wells 7 And 18, And Falcon Field Well 2
Addition, Infrastructure
Post-Bid
$6,000,000 to $7,000,000 est. value
Mesa, AZ 85203

Construction of the Maricopa Mountain DWID (MMDWID) - Phase 1 Well Drilling for Well Site No. 1B and Site 5
Results
Maricopa, AZ 85139

Red Mountain High School Storm Pump Replacement
Infrastructure
Post-Bid
$125,000 est. value
Mesa, AZ 85207

Reported 12/27/2021 11:51 AM
Project Title

Well 9 Pumping System and Refurbishment

Physical Address View project details and contacts
City, State (County) Luke Air Force Base, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to install the necessary components to make it a working well for irrigation purposes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents