Similar Projects
Municipal Building HVAC Unit Replacement
Alteration
Bidding
Beaver, PA

NAVFAC DB Replace 500 Ton Chiller, Building 3 NSA-P, PA
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Philadelphia, PA 19112

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

HVAC System and Annual Preventative Maintenance at the Beaver County Ice Arena
Post-Bid
Beaver Falls, PA 15010

Public Works Building Contract B - HVAC
Results
Reading, PA 19600

1159-HVAC Materials
Results
Karthaus, PA 16845

HVAC Upgrade Project at Erie Downtown YMCA
Renovation - 110,000 SF
Construction
$113,000 est. value
Erie, PA 16501

Williamstown Readiness Center - Rehabilitation - HVAC Construction
Alteration
Bidding
$400,000 to $500,000 est. value
Williamstown, PA

HVAC Maintenance -DSCA Mechanicsburg, PA
Post-Bid
Mechanicsburg, PA 17050

Guaranteed Energy Savings Project
Results
Mill Hall, PA 17751

Major HVAC Renovation at Vare-Washington Elementary School - General
Alteration
Bidding
$463,317 est. value
Philadelphia, PA 19147

Rehabilitation of Building 19, Frick`s Lock Village Trailhead - Schuylkill River Trail - HVAC
Post-Bid
Pottstown, PA 19464

Construction of a New Warehouse - Heating and Ventilation Construction
Results
North East, PA 16428

HVAC Maintenance
Post-Bid
York, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 2 - HVAC Construction
Results
$100,000 to $500,000 est. value
Reading, PA 19601

Last Updated 07/29/2021 08:08 AM
Project Title

Office HVAC Repairs

Physical Address View project details and contacts
City, State (County) Nazareth, PA 18064   (Northampton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location:Jacobsburg Environmental Education Center, Northampton County. Work included under this contract consists of removal and replacement of eight pumps including all necessary piping modifications. Providing eight variable speed drives (VSD) for the new pumps. Providing hydronic piping, expansion tanks, valves, thermo-wells, pressure gauges, and pipe insulation. The system will also require HVAC control devices and Re-programming of the Building Automation System (BAS).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents