Similar Projects
HVAC Replacement - Hilliard Branch
Bidding
Hilliard, OH 43026

Northland HS 25 Ton AC Replacement for AHU 14
Bidding
Columbus, OH 43229

North Residential HVAC Modifications Phase 1
Post-Bid
Less than $3,850,000 est. value
Columbus, OH 43210

Rhodes - Room 326 AHU
Post-Bid
Less than $2,198,155 est. value
Columbus, OH 43210

Renovation of HVAC Systems in Design-Build Delivery Model - Phase 6
Results
Less than $64,671 est. value
Columbus, OH 43085

2019/20 HVAC Improvements
Results
Dublin, OH 43017

Darby Woods HVAC Improvements
Post-Bid
Less than $1,716,000 est. value
Galloway, OH 43119

King Arts Complex HVAC Improvements 2019
Results
Columbus, OH 43205

HVAC Improvements and Upgrades
Post-Bid

Fairwood Facility Unit 29 HVAC Replacement -650265-100103
Results
Less than $283,200 est. value
Columbus, OH 43215

Central Safety Building HVAC System Reno
Post-Bid
Columbus, OH

Design-Build Services
Results
Columbus, OH 43211

CSCC Building Systems Upgrades - Nestor Boiler Replacements
Post-Bid
Less than $525,000 est. value
Columbus, OH 43215

Lima - Reed HVAC Upgrade
Results
Less than $235,000 est. value
Columbus, OH 43210

Replacement of Central Enrollment's 40 Ton Condensing Unit and Evaporator
Post-Bid
Columbus, OH 43211

Reported 02/10/2021 12:00 AM
Project Title

DLA Bldg. 10 & 11

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the addition of a piping loop to an existing 218 ton chiller at Building 11 and the replacement of an existing chiller at Building 10. The project includes replacing DX cooling coils in six air handling units with chilled water coils which will be supplied from the new chilled water loop. The DX condensing units associated with all these systems will be removed. The new chilled water piping loop will be installed on the outside of Building 11 and will include the installation of new pumps and will require the installation of piping support structures. The project will include work on 15 air handling unit systems in Buildings 10 and 14 air handling unit systems in Building 11. Internally lined ductwork will be removed and replaced with externally insulated ductwork. The air handling units will be refurbished by replacing the insulation on the inside of the units. Work on the air handling systems will include the installation of energy recovery units to supply outdoor air.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents