Similar Projects
Last Updated | 03/31/2020 09:32 AM |
Project Title | Hardscape Upgrades Roads and Sidewalks 2020 |
Physical Address | View project details and contacts |
City, State (County) | New Paltz, NY 12561 (Ulster County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of work for this project consists of modification and upgrades at existing curb locations along Southloop Road and Pond Road. The main features of the “Base Bid” work shall include, but are not limited to the following: Major base bid removal work includes: Milling approximately 26,850 total square feet (SF) of the top 2” of existing asphalt paving from curb to curb in Southloop Road roadway from Route 32 to Pond Road, and with minor removal of roadway at curbs. Complete removal of approximately 2,200 linear feet of existing concrete curbing on each side of roadway down to sub-base. Complete removal of approximately 540 square feet of asphalt or concrete walkways and curb cuts, along with removal of sub-base under each at various locations along Southloop Road as shown. Complete removal of approximately 200 square feet of existing topsoil for new concrete curbing and asphalt siedwalks along Southloop Road as shown. Sawcutting joint between existing concrete curbing and sidewalks (asphalt and concrete). Field verification of existing conditions in work areas prior to bidding, and coordination of all work with drawings as required. Major base bid new work includes, Contractor providing and installing all new materials per details and such as: A minimum of 2” thick of new asphalt top course as coordinated with removal areas. New concrete curbing, tack coat, and geotextile fabric as coordinated with removal areas. New warning plates at curb cut areas where shown, and as coordinated with removals. Modifications necessary at required locations to adjust height of existing manhole covers and catch basins to top of new roadway surface. New crosswalk striping and stop lines where required after sweeping all new walkways and roadway surfaces free of debris after removals. Length of stop lines shall be at least half the width of roadway. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |