Similar Projects
Glenwood Lake - 2089 - City of New Rochelle
Infrastructure
Conception
$1,000,000 CJ est. value
New Rochelle, NY 10801

Hudson Park Greenhouse - 7012 - City of New Rochelle
New Construction, Infrastructure
Conception
$250,000 CJ est. value
New Rochelle, NY 10805

The Complex at Port Chester
New Construction, Infrastructure - 15,000 SF
Design
$64,000,000 CJ est. value
Port Chester, NY 10573

Renatta Mixed Use Building / Port Chester
New Construction, Infrastructure - 12,600 SF
Design
$100,000,000 CJ est. value
Port Chester, NY 10573

RFQ Contractor - Build Community Living Center at Montrose Campus
New Construction, Infrastructure
Post-Bid
$16,500,000 CJ est. value
Montrose, NY 10548

Long Pond Gazebo Project
Infrastructure
Post-Bid
$115,000 CJ est. value
Armonk, NY 10504

Adirondack Railroad Station Platforms and Shed Project
Infrastructure
Results
$18,379,985 CJ est. value
Lake Placid, NY 12946

Consolidated Water District No. 1 Stadium Road Tank and Chemical Feed Station
Infrastructure
Results
$16,931,264 CJ est. value
White Plains, NY 10607

Hackley School Arts Center
Demolition, New Construction, Infrastructure
Construction
$40,950,000 CJ est. value
North Tarrytown, NY 10591

Hackley School Arts Center
Demolition, New Construction, Infrastructure
Construction
$40,950,000 CJ est. value
North Tarrytown, NY 10591

Ray Place Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Scarsdale, NY 10583

ARC Westchester Renovation
Addition, Infrastructure, Renovation
Pending Verification
$1,500,000 CJ est. value
Mount Kisco, NY 10549

Midland Avenue Self-Storage
New Construction, Infrastructure - 80,000 SF
Conception
$13,500,000 CJ est. value
Rye, NY 10580

Atlantic Appliance
New Construction, Infrastructure - 25,720 SF
Design
$5,000,000 CJ est. value
Yorktown Heights, NY 10598

Cleaning and Cement Mortar Lining of Water Mains
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Yorktown Heights, NY 10598

Last Updated 09/27/2023 11:22 AM
Project Title

Rehabilitate Natural Science Building - Purchase College

Physical Address View project details and contacts
City, State (County) Harrison, NY 10577   (Westchester County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2023, an architect has been selected. The project is currently in design and in the municipal approvals process. Schematic design is expected to concluded in fall of 2023. A firm timeline for construction has not been established. *The previous solicitation is listed below for reference. --- The State University Construction Fund (the Fund) is seeking Statements of Qualifications from consultants to provide design services through the Schematic Design Phase for the comprehensive phased renovation of the Natural Science Building (approximately 108,000 square feet). Design services for the full project, including phasing documents, shall completed to the Schematic Design Phase level. Upon Schematic Phase approval by the Fund, services would likely commence for the design and construction of a Phase 1 portion of the project. The project will include full replacement of all interior finishes and components, all MEP systems, laboratory casework and exhaust systems, roof and elevator, as well as the abatement of hazardous materials. Consultant will be required to determine the optimum phasing of construction based on available funding and potential surge space. The building design and all new components and systems will comply with the new SUCF Directive 1B-2, Net Zero Carbon New Buildings and Deep Energy Retrofits of Existing Buildings. Design services will initially proceed though Schematic Design Phase level. Upon review, evaluation and approval by the Fund, the remainder of the project may be released for continuation of Design Services.

Details

108,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents