Similar Projects
100 South Waterline Replacements
Post-Bid
Centerville, UT

Underground Pressurized Irrigation
Post-Bid
Bountiful, UT

Construction of the 2175 South Improvement Project
Results
Less than $2,250,000 est. value
Syracuse, UT

Construction of the Main Street - SR-106 Storm Drain and Culinary Waterline Replacements
Results
Less than $300,490 est. value
Centerville, UT

600 South, 650 South, and 800 East Waterline Replacements and Storm Drain
Post-Bid
$500,000 est. value
Centerville, UT

300 East Waterline and Road Reconstruction Project
Results
Less than $830,000 est. value
Kaysville, UT

Waterline Replacement on Main Street (SR-126) From 850 North To 1300 North
Post-Bid
Less than $405,000 est. value
Sunset, UT 84015

West Porterville Piping Project
Results
Less than $1,800,000 est. value
Kaysville, UT

Culinary and Secondary Tank Transmission Line Replacement Project
Post-Bid
Syracuse, UT 84075

Tolman Elementary Waterline Replacement
Results
$200,000 to $300,000 est. value
Bountiful, UT

Legacy Lands Subd. Culinary Waterline
Post-Bid
Centerville, UT

Chelemes Utility Improvement Project
Results
Clearfield, UT 84015

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 Capital Projects
Results
$569,820 to $801,612 est. value
Fruit Heights, UT 84037

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Last Updated 02/08/2019 10:04 AM
Project Title

Mabey Pond Water Supply Improvement Project

Physical Address View project details and contacts
City, State (County) Clearfield, UT   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $310,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work includes, but is not limited to, furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; and mobilization; obtaining all bonds and insurance, saw cutting asphalt & concrete, modification to the existing concrete vault which houses the well motor and pumping facilities, electrical modifications to the well housing vault, removing and disposing of existing asphalt and trench material; furnishing and installing approximately 1,950 feet of 10-inch diameter pvc pipe with 4' diameter manholes; furnish and installing approximately 475 feet of 12-inch diameter rcp piping, storm water junction boxes, chain link fencing, furnish and install a pond inlet and overflow/outlet structures, handicap ramps, curb & gutter and waterways, asphalt trench patching, irrigation and sod repair, placement of large stones as rip-rap and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents