Similar Projects
Health & Science Center Building Expansion
Addition
Design
$4,000,000 est. value
North Platte, NE

SCC Residence Hall BP 2
Renovation
Bidding
$50,000,000 est. value
Lincoln, NE 68520

Central Community College Snack Bar Remodel
Renovation
Bidding
$300,000 est. value
Grand Island, NE 68801

Construction Manager at Risk for Lincoln Residence Hall
New Construction
Post-Bid
Milford, NE 68405

Construction Manager for Phase 2 of the UNL College of Engineering
New Construction
Post-Bid
Lincoln, NE

MCC Fort Omaha Campus Building 10 Renovation
Renovation
Results
Omaha, NE

WSC - Morey Hall Restroom Remodel - Phase III
Renovation
Results
Wayne, NE

UNMC Scott Plaza Ice Rink Canopy
New Construction
Post-Bid
Omaha, NE 68105

Hamilton Hall 3rd Floor South Renovation-13609
Renovation
Results
Lincoln, NE

AEC Shell Fit Out
New Construction - 2,775 SF
Post-Bid
Beatrice, NE 68310

UNO Central Utilities Plant Boiler & Deaerator Equipment Purchase
Term Contract
Results
Lincoln, NE

UNK FSL Housing-Martin Hall Bid Package 5
New Construction
Post-Bid
Kearney, NE 68845

WSC - Athletic and Recreation Laundry
Renovation
Results
Wayne, NE 68787

Kiewit Hall Finishes and Miscellaneous Packages
Renovation
Post-Bid
Omaha, NE

Board Room Remodel
Renovation
Results
Grand Island, NE 68801

Last Updated 05/27/2022 02:09 AM
Project Title

Construction Manager at Risk - Architecture Complex Renovation Phase 2

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68588   (Lancaster County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,393,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is to complete a combination of LB384 upgrades in five primary areas: 1) Utilities serving Architecture Hall West from the north; 2) Mechanical and electrical systems serving Architecture Hall West; 3) Code deficiencies in means of egress and plumbing fixture counts; 4) ADA and other functional deficiencies in the Stacks addition; 5) Other miscellaneous deferred maintenance items such as slate roof repairs to Architecture Hall, replacement of translucent panel skin at the Architecture Hall skylight, removal of mortar at all overhanging limestone and replacement with high-grade sealant for improved weatherability and cleaning and restoration of exterior brick and limestone.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents