Similar Projects
Rock Prairie Management District No 2 Midtown Reserve Subdivision Phase 104
Post-Bid
College Station, TX

Rock Prairie Management District No. 2 Midtown City Center Phase 601
Post-Bid
College Station, TX 77840

Rock Prairie Management District No 2 - Midtown Reserve Subdivision Phase 100
Results
College Station, TX 77840

Lick Creek Trunk Line
Results
College Station, TX 77840

Rock Prairie Management District No. 2 Midtown Reserve Phase 200
Post-Bid
College Station, TX 77840

Provide and Install Eight (8) On-Site Sewage Facilities
Results
College Station, TX

Southwood Valley Sanitary Sewer Trunk Line - Phase 1
Results
Less than $1,410,000 est. value
College Station, TX

8", 21", and 24" Sewer Trunk Line
Results
College Station, TX 77840

Northeast Sanitary Sewer Trunk Line - Phase 2
Results
Less than $2,587,400 est. value
College Station, TX 77854

Greenbrier Phase 13 Sewer Extension
Results
Less than $381,571 est. value
Bryan, TX 77803

Grease Trap Pumping & Spent Cooking Grease Collection
Term Contract
Results
Bryan, TX 77801

Aerobic-Surface Application Sewage Facility
Results
Less than $294,774 est. value
College Station, TX 77843

Construction of Water, Drainage, and Paving Facilities for Millican Reserve Meadows Phase III
Results
College Station, TX

Midtown Reserve Phase 201
Results
TX

Francis Drive Rehabilitation Phase 1 and 2
Results
$3,000,000 est. value
College Station, TX 77840

Last Updated 05/06/2019 02:01 PM
Project Title

8X10X4 Manhole Vault

Physical Address View project details and contacts
City, State (County) TX   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Manholes shall have a minimum of a 42" hole opening. Ladder ups will be mounted in the center of every ladder. All 600 amp T-bodies and 200 amp elbows will have test points. All manholes will be clean at the completion of the project. Stabilizing sand shall be used for installation of all manholes. A minimum of 10 feet of rigid conduit with galvanized bell ends shall be required on each duct bank coming in and going out of the manhole. Alt conduits shall be cut off flush with the wall in the manholes. All electrical manhole covers shall be labeled with electric on the top of them. All cables shall be labeled with feeder number and bldg. numbers, cables should be marked with red and blue marking tape to identify the phases. Ail switches shall be anchor down and set so that it can be operated from manhole lid opening. Any position on the switch that is not used shall have a bushing well insert on the switch and a dust cover on the bushing and shall be grounded. Any terminations in the manhole shall be supported between the rack in the manhole and as close the wall as possible. All empty ducts coming into manholes shall be sealed off. All fire taping shall be wrapped with cloth taping (3M 77cloth tape). All ducts shall be swapped before sealing or pulling cable and shall have a pull string in each conduit. All racks shall be as high as possible in manhole All racks and rack arms shall be fiber glass Tie wraps shall be 3' in length and VS" in width Manhole lids shall be 4" above final grade. Iron castings for manhole rings and covers shall conform to ASTM A48, Class 30, and be traffic rated
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents