Richey Street Public Realm Improvements
Infrastructure
Bidding
Pasadena, TX 77502

FM 791 - Safety Improvement Projects
Infrastructure
Bidding
$175,054 est. value
TX

IH 10- Hazard Elimination and Safety
Post-Bid
$4,937,382 est. value
TX

CR 205, from FM 1358 to FM 1358
Post-Bid
TX

Road Construction at Neuens Road Between Gessner Road and Blalock Road
Results
Less than $11,788,980 est. value
Houston, TX 77002

Hazard Elimination and Safety
Results
Less than $21,137,291 est. value
TX

IH 610 - Overlay
Infrastructure
Bidding
$1,383,991 est. value
TX

Overlaying Roads
Infrastructure
Post-Bid
Kountze, TX 77625

Road Construction at East Kennings Road from Bohemian Hall Road to the Dead End
Results
Houston, TX 77002

Gessner Road Crosswalk Pavers Replacement
Infrastructure
Post-Bid
$530,000 est. value
Houston, TX 77282

Construction of the Paving and Appurtenances to Serve Edgewater Section 15 and Water Street Extension
Results
TX

Construction of Roadway Improvements on CR 193
Infrastructure
Post-Bid
TX

Intersection Improvements
Results
Less than $1,618,993 est. value
TX

Trails at Windy Hill Phase Four and Five Paving, Drainage, Water and Wastewater Improvements
Results
TX

Paving Improvements for the Highlands Section Five
Results
TX

Last Updated 01/08/2022 12:18 AM
Project Title

US 385 - Highway Improvement

Physical Address View project details and contacts
City, State (County) TX   (Ector County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,486,043
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6015 Removing Conc (Sidewalks) Sy 141.000 1 104 6017 Removing Conc (Driveways) Sy 148.000 2 104 6022 Removing Conc (Curb And Gutter) Lf 2,859.000 3 105 6016 Removing Stab Base & Asph Pav(16") Sy 1,185.000 4 150 6002 Blading Hr 10.000 5 216 6001 Proof Rolling Hr 10.000 6 310 6005 Prime Coat (Ae-p) Gal 237.000 7 315 6004 Fog Seal (Css-1h) Gal 21,322.000 8 316 6017 Asph (Ac-20-5tr) Gal 40,062.000 9 316 6126 Aggr(Ty-Pb Gr-4 Sac-a) Cy 958.000 10 346 6040 Stone-Mtrx-Asph Smar-f Sac-a Ton 11,597.000 11 346 6058 Tack Coat Gal 10,543.000 12 354 6049 Plane Asph Conc Pav (6") Sy 83,753.000 13 354 6152 Plane Asph Conc Pav (9") Sy 21,674.000 14 360 6021 Conc Pvmt (Jointed - Cpcd) (11") Sy 875.000 15 360 6083 Conc Pvmt (Jc) (Transition Slab) Sy 310.000 16 416 6030 Drill Shaft (Trf Sig Pole) (24 In) Lf 6.000 17 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 13.000 18 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 20.000 19 423 6015 Retaining Wall (Special) Sf 500.000 20 450 6048 Rail (Handrail)(Ty b) Lf 100.000 21 479 6001 Adjusting Manholes Ea 12.000 22 479 6005 Adjusting Manholes (Water Valve Box) Ea 5.000 23 500 6001 Mobilization Ls 1.000 24 502 6001 Barricades, Signs And Traffic Handling Mo 17.000 25 506 6020 Construction Exits (Install) (Ty 1) Sy 400.000 26 506 6024 Construction Exits (Remove) Sy 400.000 27 506 6035 Sandbags For Erosion Control Ea 332.000 28 506 6042 Biodeg Erosn Cont Logs (Instl) (18") Lf 480.000 29 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 480.000 30 529 6008 Conc Curb & Gutter (Ty Ii) Lf 1,780.000 31 530 6004 Driveways (Conc) Sy 1,406.000 32 531 6002 Conc Sidewalks (5") Sy 2,155.000 33 531 6024 Curb Ramps (Ty 7) Sy 40.000 34 618 6029 Condt (Pvc) (Sch 40) (3") Lf 178.000 35 618 6030 Condt (Pvc) (Sch 40) (3") (Bore) Lf 370.000 36 624 6008 Ground Box Ty c (162911)w/Apron Ea 11.000 37 636 6001 Aluminum Signs (Ty a) Sf 48.000 38 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 14.000 39 644 6009 In Sm Rd Sn Sup&Am Ty10bwg(1)Sb(p) Ea 35.000 40 644 6044 In Sm Rd Sn Sup&Am Tys80(1)Sb(u) Ea 1.000 41 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 12.000 42 644 6076 Remove Sm Rd Sn Sup&Am Ea 50.000 43 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 12,630.000 44 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 50,520.000 45 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 8,568.000 46 662 6016 Wk Zn Pav Mrk Non-Remov (w)24"(Sld) Lf 5,194.000 47 662 6017 Wk Zn Pav Mrk Non-Remov (w)(Arrow) Ea 160.000 48 662 6032 Wk Zn Pav Mrk Non-Remov (y)4"(Brk) Lf 8,886.000 49 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 48,382.000 50 662 6057 Wk Zn Pav Mrk Remov (Traf Btn) Ty w Lf 18,810.000 51 662 6059 Wk Zn Pav Mrk Remov (Traf Btn) Ty y Lf 37,620.000 52 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 7,206.000 53 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 6,725.000 54 666 6030 Refl Pav Mrk Ty i (w)8"(Dot)(100mil) Lf 101.000 55 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 4,783.000 56 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 6,174.000 57 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 10,355.000 58 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 3,264.000 59 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 19,222.000 60 668 6076 Prefab Pav Mrk Ty c (w) (24") (Sld) Lf 2,951.000 61 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 50.000 62 668 6091 Prefab Pav Mrk Ty c (w) (18")(Yld Tri) Ea 23.000 63 672 6007 Refl Pav Mrkr Ty i-c Ea 330.000 64 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 775.000 65 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 34,949.000 66 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 4,284.000 67 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 2,597.000 68 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 80.000 69 680 6011 Install Hwy Trf Sig (Upgrade) Ea 2.000 70 682 6001 Veh Sig Sec (12")Led(Grn) Ea 6.000 71 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 4.000 72 682 6003 Veh Sig Sec (12")Led(Yel) Ea 6.000 73 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 8.000 74 682 6005 Veh Sig Sec (12")Led(Red) Ea 6.000 75 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 4.000 76 682 6054 Backplate w/Ref Brdr(3 Sec)(Vent)Alum Ea 6.000 77 682 6055 Backplate w/Ref Brdr(4 Sec)(Vent)Alum Ea 4.000 78 684 6033 Trf Sig Cbl (Ty a)(14 Awg)(7 Condr) Lf 362.000 79 684 6046 Trf Sig Cbl (Ty a)(14 Awg)(20 Condr) Lf 673.000 80 686 6045 Ins Trf Sig Pl Am(s)1 Arm(44') Ea 1.000 81 686 6053 Ins Trf Sig Pl Am(s)1 Arm(50') Ea 1.000 82 690 6005 Install Of Vehicle Detectors Lf 1,300.000 83 690 6024 Removal Of Signal Head Assm Ea 10.000 84 690 6025 Replace Of Signal Head Assm Ea 9.000 85 690 6029 Install Of Signal Related Signs Ea 4.000 86 690 6033 Removal Of Traffic Signal Pole Fnd Lf 4.000 87 690 6051 Removal Of Signal Pole Assm Ea 2.000 88 3077 6009 Sp Mixes Sp-b Pg76-22 Ton 25,780.000 89 3077 6075 Tack Coat Gal 10,661.000 90 6001 6002 Portable Changeable Message Sign Ea 4.000 91 6027 6009 Ground Box (Adjust) Ea 5.000 92 6185 6002 Tma (Stationary) Day 1,228.000 93 6185 6005 Tma (Mobile Operation) Day 33.000 94 6306 6001 Vivds Prosr Sys Ea 1.000 95 6306 6003 Vivds Cam Assy Var Lns Ea 4.000 96 6306 6007 Vivds Cabling Lf 1,000.000 97

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents