Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

US26: Salmon River - Zigzag Sec.
Infrastructure
Bidding
$10,000,000 CJ est. value
Sandy, OR 97055

242nd Avenue / Borges Realignment Project
Infrastructure
Bidding
$400,000 CJ est. value
Oregon City, OR 97045

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

US26: SE Kelso Rd - Frog Lake Sno Park Section of the Mt Hood and Warm Springs Highway (Rt. No. US26) beginning in Sandy
Infrastructure
Results
$500,000 to $1,000,000 est. value
Sandy, OR

River Grove Elementary School Replacement - Site Package Project
Infrastructure
Results
Lake Oswego, OR 97035

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Maplelane Road and Walnut Grove Way Mixed-Use
New Construction, Infrastructure - 4,000 SF
Construction
$82,000,000 CJ est. value
Oregon City, OR 97045

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Frog Pond Oaks Subdivision
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Wilsonville, OR 97070

Meek Street Improvements, North Phase - City of Milwaukie
Infrastructure
Conception
$3,090,000 CJ est. value
Milwaukie, OR 97222

Last Updated 04/17/2023 08:26 AM
Project Title

Scott Creek Park/Mt. Scott Trail Storm Repair

Physical Address View project details and contacts
City, State (County) Happy Valley, OR 97086   (Clackamas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $152,830 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Scott Creek Park/Mt. Scott Trail Storm Repair Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holders List. Prospective Bidders are responsible for obtaining any Addenda from Website listed above. Engineers Estimate: $127,000.00 Contact Information Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us Prevailing Wage Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement: PREVAILING WAGE RATES for Public Works Contracts in Oregon, January 1, 2022, as amended on April 1, 2022 which can be downloaded at the following web address: electronically The Work will take place in Clackamas County, Oregon. Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses. Each Bid must be accompanied by either 1) a cashier's check or a certified check drawn on a bank authorized to do business in the State of Oregon, or 2) a Bid bond described hereinafter, executed in favor of the Owner, for an amount equal to ten percent (10%) of the total amount Bid as a guarantee that, if awarded the contract, the Bidder will execute the contract and provide a performance bond and payment bond as required. The successful Bidder's check or Bid bond will be retained until the Bidder has entered into a contract satisfactory to Owner and furnished a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond. The Owner reserves the right to hold the Bid security as described in Article 10 hereof. Should the successful Bidder fail to execute and deliver the contract as provided for in Article 12 hereof, including a satisfactory performance bond and payment bond within twenty (20) calendar days after the Bid has been accepted by the Owner, then the contract award made to such Bidder may be considered canceled and the Bid security may be forfeited as liquidated damages at the option of the Owner. The date of the acceptance of the Bid and the award of the contract as contemplated by the Project Manual shall mean the date of acceptance specified in the Notice of Intent to Award.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents