Similar Projects
KR Harrington Water Treatment Plant Filter Supplies
Term Contract
Design
Nashville, TN 37214

Fountain and Aerator Parts and Repair Services
Term Contract
Sub-Bidding
Nashville, TN 37219

City of Belle Meade Stormwater Infrastructure Improvements - Sutherland Avenue
Term Contract
Sub-Bidding
Belle Meade, TN 37205

Sidewalk Construction and Maintenance Services
Infrastructure
Post-Bid
Nashville, TN

Landscape Maintenance at Cumberland View Apartments
Alteration
Post-Bid
Nashville, TN 37208

TWRA Spillway Control Systems Repair
Term Contract
Sub-Bidding
Nashville, TN 37211

Pest Control Services
Term Contract
Post-Bid
TN

Water System Audit for Water Services
Term Contract
Sub-Bidding
Nashville, TN 37219

TWRA Portable Toilet Rental and Service
Term Contract
Post-Bid
Nashville, TN

IDIQ MATOC for Land-Based Civil Work Construction Projects
Term Contract
Post-Bid
$250,000,000 CJ est. value
Nashville, TN 37219

Godwin Products, Parts, and Service
Term Contract, Alteration
Post-Bid
$950,000 est. value
Nashville, TN

Solar Systems Repair and Preventive Maintenance Services
Term Contract
Post-Bid
Nashville, TN 37219

Polymers for Wastewater Treatment Faculties
Term Contract
Post-Bid
Nashville, TN 37219

Grounds Equipment General Repair and Maintenance
Term Contract
Post-Bid
Nashville, TN 37219

PLC Upgrade for Existing Blowers at Central WRF
Term Contract
Post-Bid
Nashville, TN 37208

Last Updated 06/15/2023 03:18 PM
Project Title

Provide Ice Rink Refrigeration System Maintenance

Physical Address View project details and contacts
City, State (County) Nashville, TN 37219   (Davidson County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Technicians must be certified by R.E.T.A (Refrigerating Engineers and Technicians Association) as industrial refrigeration operators. Contractor must be able to provide 24 hour, 7 days per week, on-call service within 2 hours of call, in case of emergencies. Walk- through inspection of chiller room and condenser to ensure proper operation Check belts and tighten, if needed. Check and date mark brine/glycol reservoir levels Check ammonia level Pull brine/glycol samples and test for proper levels of corrosion inhibitors Inspect condenser nozzles and mist eliminators Document all service and recommendations in writing Metro reserves the right to issue additional rounds as it deems necessary for the purposes of evaluation. Additional rounds may include, but not be limited to, Offeror interviews. Metro reserves the right to make multiple awards for a contract if it is deemed in the best interest of Metro.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents