Similar Projects
Replacement of Fire Station 10 - Gate City Boulevard - 89 - City of Greensboro
New Construction, Infrastructure
Conception
$9,450,000 CJ est. value
Greensboro, NC 27407

Recreation Senior Center - City of High Point
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
High Point, NC 27260

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

Smith Farm Apartments
New Construction, Infrastructure
Design
$109,000,000 CJ est. value
Greensboro, NC 27410

Downtown Greenway Phase 4
Infrastructure
Bidding
$17,300,086 CJ est. value
Greensboro, NC 27401

RFQ Construction Manager at Risk - Airfield Equipment Storage Building
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Greensboro, NC 27409

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

Liberty Road Water and Sewer Improvements Phase III
Infrastructure
Results
Greensboro, NC 27497

Water and Sewer Maintenance/Emergency 2022-23
Infrastructure
Results
$300,000 est. value
High Point, NC

Battleground Avenue Self Storage / Greensboro
New Construction, Infrastructure - 90,750 SF
Construction
$8,000,000 CJ est. value
Greensboro, NC 27408

Linder Industrial Machinery
New Construction, Infrastructure - 32,000 SF
Construction
$9,000,000 CJ est. value
Greensboro, NC 27406

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

Wolfetrail Road Multi Residential
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Greensboro, NC 27406

Mackay Road - 158 - City of Greensboro
Infrastructure
Conception
$3,536,680 CJ est. value
Greensboro, NC 27407

Last Updated 06/26/2023 02:35 PM
Project Title

Sandy Ridge Road Water Line Improvements

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27235   (Guilford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $973,705 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 21, 2022, the project has been awarded. A timeline for construction has not been confirmed. Documents posted on ConstructConnect are for viewing purposes only, if a bidder wants to be considered they must purchase documents directly from The City of Greensboro. The Contract consists of approximately 2,030 linear feet of new 12-inch ductile iron water line along Sandy Ridge Road in Greensboro, NC. The new Sandy Ridge Road water line will be connected to an existing 12-inch water line at the intersection of W. Market Street and Sandy Ridge Road, extending north along Sandy Ridge Road, connecting to an existing 12-inch ductile iron water line at the intersection of Farrington Road and Sandy Ridge Road. A more expansive summary of work can be found in Section 01 11 13 Summary of Work. Sealed proposals and MWBE documentation (Affidavits and Good Faith Efforts) must be submitted on the blank forms provided and as specified in the bound copies of the contract documents. This is a bifurcated bid process. Therefore, the Proposal and MWBE documentation shall be enclosed in two different sealed envelopes addressed to Mr. John Fersner, Engineering Division, 300 West Washington Street, Suite 322, Greensboro, North Carolina 27401. No proposal shall be considered or accepted by the City unless at the time of its filing the same shall be accompanied by a five percent bid security as indicated in the Instructions to Bidders. A separate performance bond and payment bond each in an amount equal to one hundred percent (100%) of the contract price will be required of the Successful Bidder following award of the Contract by the City. Consideration will be given only to proposals submitted by contractors licensed in the state of North Carolina under the Contractors Licensing Act of 1925 or as amended. The City reserves the right to waive any informality or to reject any or all bids or to award such contract as in its judgment is deemed to the best interest of the City. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents