Similar Projects
BWGP Breaker Change Out Project
Post-Bid
Fayetteville, NC 28302

Recitifier Replacement A 3863
Post-Bid
Fort Bragg, NC 28310

Annual Construction Service Contract for Underground Distribution Construction
Term Contract
Results
Less than $1,000,000 est. value
Fayetteville, NC

Judge E. Maurice Braswell Cumberland County Courthouse Generator Replacement
Results
Less than $2,737,200 est. value
Eastover, NC 28301

Rectifier Replacement 4-2843
Post-Bid
Fort Bragg, NC 28310

Annual Transformer Contract
Results
Fayetteville, NC

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Relay Control Switchboards for the Pod 3 Upgrade
Results
Less than $344,531 est. value
Fayetteville, NC

Replacement Powerboards
Post-Bid
Fort Bragg, NC 28310

Relay Control Switchboards for the Bordeaux Substation
Results
Less than $144,193 est. value
Fayetteville, NC

Replace Standby Power Generator at the Rockfish Creek WRF
Post-Bid
Fayetteville, NC 28306

LED Luminaries and Brackets
Results
Fayetteville, NC

FORSCOM Uninterrupted Power Supply (UPS) Maintenance and Battery Replacement
Post-Bid
Fort Bragg, NC 28310

27KV Class 1200 AMP Feeder Vacuum Circuit Breakers for Miscellaneous Substations
Results
Less than $357,180 est. value
Fayetteville, NC 28302

Annual Transmission Construction Contract
Term Contract
Post-Bid
Fayetteville, NC

Last Updated 10/28/2020 02:14 PM
Project Title

Lighting Replacement - Mates at Fort Bragg

Physical Address View project details and contacts
City, State (County) Fort Bragg, NC 28310   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing light fixtures and install LED light fixtures in several areas, install LED Light fixtures and electrical circuit in each of the CHP Buildings 1. Office Area 2. Maintenance Bay 3. Warehouse / Supply 4. Shelter 5. CHP Building O-9316 6. CHP Building O-9317 All work to be done within OSHA regulations

Details

Division 26 - Electrical, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents