Similar Projects
Concrete Floor at Airpark
Bidding
Wintersville, OH

Whitehall-Yearling HS Russ Gregg Gym Floor Replacement
Bidding
$92,000 est. value
Columbus, Whitehall, OH 43213

Corrections Center Continuation Phase 2A
Sub-Bidding
$8,077,538 est. value
OH

Loramie Local School District Fort Loramie Elementary Playground Flooring
Post-Bid
Less than $120,000 est. value
Fort Loramie, OH 45845

Gym Floor Refinishing 2020 - Sanding
Term Contract
Post-Bid
Columbus, OH

OKI Boardroom Carpet Project
Results
Cincinnati, OH 45202

M--Tile and Grout Cleaning and Seal
Results
Cleveland, OH 44106

Carpet Tile Installation Services
Bidding
Columbus, OH

Repair/Replace Flooring at Various Sites
Post-Bid
Canton, OH 44702

Apparatus Floor Coating for Station #13
Results
Akron, OH 44301

Floor Tile Installation Services
Bidding
$200,000 est. value
Columbus, OH

Thompson Game Room Floor Renovation
Post-Bid
Columbus, OH

Great Hall Floor Leveling
Results
Less than $90,000 est. value
Athens, OH 45701

Westerville Community Center Flooring Project
Bidding
Westerville, OH 43082

VCT Flooring Improvements 2020
Post-Bid
Columbus, OH

Reported 01/22/2020 12:00 AM
Project Title

Gym Floor Refinishing 2020 - Screening

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work which shall include: 1. Protection of the surrounding building amenities 2. Screening of flooring surface to apply oil based polyurethane finish 3. Remove all transitions that can be easily removed 4. Protect all transitions that cannot be easily removed 5. Screen floor with fine grit pad or screen to abrade surface per MFMA standards 6. Application of one (1) coats of new finish 7. Touchup of all athletic paint markings on floors as required outlined below, and in bid specifications 8. Re-install floor transitions that were removed 9. Clean up and return impacted work area to previous state prior to contractors arrival

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents