Similar Projects
Last Updated | 01/06/2023 03:12 PM |
Project Title | RFP Engineering- Perpetuation - Noise Barrier Wall Evaluation - IH 94 |
Physical Address | View project details and contacts |
City, State (County) | Hammond, WI 54015 (Saint Croix County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected January 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: A noise wall is needed to mitigate the affects of noise on nearby neighborhoods. The perpetuation project for a new noise barrier wall (N-55-0003) on IH 94 (0.0 miles) in St. Croix County on the northbound side of STH 35 at the High Ridge/Hanley Road Interchange. Evaluate the SB side along the exit ramp to determine if the existing noise barrier wall (N-55-0002) length is adequate or needs to be extended. Construct using single lane closures, as needed for access, under peak hour restrictions. Anticipated Construction Cost: $1,000,000-$1,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-03 RFP Engineering- Perpetuation - Noise Barrier Wall Evaluation |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |