Similar Projects
98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Conception
$6,200,000 CJ est. value
Vero Beach, FL 32966

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Conception
$6,200,000 CJ est. value
Vero Beach, FL 32966

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Design
$6,200,000 CJ est. value
Vero Beach, FL 32966

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Design
$6,200,000 CJ est. value
Vero Beach, FL 32966

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Infrastructure
Results
$1,800,000 est. value
Vero Beach, FL 32969

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sebastian Eco Lodges
New Construction, Infrastructure - 4,436 SF
Pending Verification
$4,500,000 CJ est. value
Sebastian, FL 32958

Heritage Grove
New Construction, Infrastructure
Pending Verification
$31,700,000 CJ est. value
Vero Beach, FL 32962

Grande Pointe
New Construction, Infrastructure - 349,727 SF
Design
$130,800,000 CJ est. value
Gifford, FL 32967

Street Sweeping Services
Term Contract
Post-Bid
FL

Asphalt Repair - Treasure Coast Primary Asphalt Repair - Routine Maintenance
Infrastructure
Results
$400,000 est. value

7 Brew / Vero Beach
Demolition, New Construction, Infrastructure
Pending Verification
$250,000 CJ est. value
Vero Beach, FL 32966

Last Updated 09/29/2022 09:06 AM
Project Title

RFP Engineering - SR 5/ US-1/ Overseas Highway from MM 108.4 to MM 112.8

Physical Address View project details and contacts
City, State (County) Sebastian, FL 32958   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $13,124,954 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 29, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 06 Selection Method : Letter of Response and Interview TRC Members (Subject to Change) : Auraliz Benitez Pablo Alonso Renato Marrero The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Financial Management Number(s) 446005-1-32-01 Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Tuesday, August 10, 2021 Tentative Interview Date: Wednesday, August 11, 2021 Longlist Date/Time 7/21/2021 Shortlist Selection Date/Time 7/26/2021 Phase II Submittal Deadline Date/Time 8/11/2021 Final Selection Date/Time 9/07/2021 Negotiations Period Begin Date 9/15/2021 Negotiations Period Ending Date 10/30/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 5/ US-1/ Overseas Highway from MM 108.4 to MM 112.8

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents