Similar Projects
Last Updated | 08/17/2023 12:33 PM |
Project Title | Hot Mix Asphalt Resurfacing, Full Depth Concrete Pavement Repairs, Joint Resealing and Underdrain Outlet Cleanout on I-196 |
Physical Address | View project details and contacts |
City, State (County) | Fennville, MI 49408 (Allegan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $2,967,568 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 6.99 mi of hot mix asphalt resurfacing, full depth concrete pavement repairs, joint resealing and underdrain outlet cleanout on I-196 from south of 71st Street to north of 118th Avenue, Allegan County. Net classification required for this project is 2851 Ba or Comb/Jt. 2851 Cb, Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ba, Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No IM 03033 210832A 23A0700 MI DOT - 2308 044 - Hot Mix Asphalt Resurfacing, Full Depth Concrete Pavement Repairs, Joint Resealing and Underdrain Outlet Cleanout on I-196 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |