Similar Projects
Indoor Shooting Range
New Construction - 30,000 SF
Conception
$8,000,000 est. value
Lake Geneva, Lyons, WI 53147

Community Development Block Grant (CDBG) Close Program
New Construction
Design
Elkhorn, WI

Park Recreation And Forestry Cold Storage Building - 1900 Aviation Drive
New Construction, Infrastructure - 5,900 SF
Design
$484,000 CJ est. value
Waukesha, WI 53188

Riverside South Toilet Rooms Project
Term Contract, Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
La Crosse, WI 54601

Lake Farm Shelters 2&3 Roof Replacement
Renovation
Bidding
$2,400,000 CJ est. value
Madison, WI 53711

Old Settlers Park Band Shelter
Post-Bid
Salem, WI 53168

Shelter In Dog Park
New Construction
Post-Bid
Richland Center, WI 53581

Van Zeeland Park Pavilion
Results
Combined Locks, WI

2021 Heiden Haus
Renovation, Addition
Results
Madison, WI 53705

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Shoot Point Blank
New Construction - 13,187 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Greenfield, WI 53228

Port Washington Avenue Mixed Use Development
New Construction
Pending Verification
Milwaukee, WI 53212

Crossroads at Franklin
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Franklin, WI 53132

Boat Wash/Decontamination Station Construction
Infrastructure
Design
$700,000 CJ est. value
Markesan, WI 53946

Swan Park Splash Pad
Infrastructure, Renovation
Bidding
$1,300,000 CJ est. value
Beaver Dam, WI 53916

Last Updated 08/29/2022 11:32 PM
Project Title

2021 Vault Toilet Replacement Group 3

Physical Address View project details and contacts
City, State (County) Dodgeville, WI 53533   (Iowa County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $278,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 7, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** In general the work consists of removing existing vault toilet buildings, preparing the site for installation of new vault toilet buildings by others, excavation, backfill, culvert pipe, stone retaining walls, concrete sidewalk, wood fence, pavement marking, restoration, and incidentals necessary to complete the work All bids received from contractors who are not certified will be rejected This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Estimate Construction Cost $400,000 Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. A pre-bid tour has not been scheduled for this project. The contractor may view the site at their 17 convenience.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents