Similar Projects
6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Lacrosse - Westby, Brickyard Lane to CTH M
Post-Bid
La Crosse, Westby, WI 54602

Street Resurfacing - Walnut Road And Lakeshore Way
Results
Twin Lakes, WI 53181

Star Prairie - Osceola, Scl to Cth Y
Post-Bid
Osceola, Star Prairie, WI

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Paving Work
New Construction
Results
Milwaukee, WI 53202

Bioswale
New Construction
Results
Milwaukee, WI

2020 Asphalt Pavement Repair
Results
Less than $69,000 est. value
Cedarburg, WI 53012

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Road Repairs - Entrance Lot C to Sunset Campgrounds
Results
Less than $461,000 est. value
Kansasville, WI 53139

Last Updated 04/14/2021 08:22 AM
Project Title

CTH-ES (Main Street) West Street to STH-20

Physical Address View project details and contacts
City, State (County) Walworth, WI   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work under this project consists of asphaltic milling, HMA pavement, culvert removal and replacement, new concrete curb and gutter, water main replacement, water services, sanitary and storm sewer rehabilitation, sidewalk replacement, decorative concrete sidewalk, pavement marking, restoration; and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. The centerline length of the project is approximately 2.0-miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents