Similar Projects
Missionary Village Lift Station Improvements - 6022386 - Manatee County
Alteration
Design
$2,226,000 est. value
Bradenton, FL 34212

Nassau Water Reclamation Facility (WRF) Exploratory Injection Well
Infrastructure
Bidding
$950,000 est. value
Jacksonville, FL

North Water Treatment Plant Feedwater Pump and VFD Replacement
Infrastructure
Bidding
$450,000 est. value
Jensen Beach, FL 34957

Wet Well Cleaning
Post-Bid
North Port, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

Well House Replacement - Contract II
Results
Less than $150,000 est. value
Cottondale, FL 32431

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Southeast Polk Wellfield Lower Floridan Aquifer Test Production Well No 3
Alteration
Bidding
$3,301,000 est. value
Winter Haven, FL

Well Boring and Drilling
Post-Bid
Tampa, FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

Plugging and Abandonment of Orphaned Oil and Gas Well (Sevier 14-1)
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spring Hill, FL 34611

Flygt and ABS Pumps, Parts and Repairs
Post-Bid
FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Springtree Biscayne Aquifer Well S-23
Infrastructure
Bidding
$176,251 est. value
Sunrise, FL 33351

Southwest Water Treatment Plant 3 Test Well Specifications
Post-Bid
Kissimmee, FL

Reported 06/29/2022 12:00 AM
Project Title

Well Repair, Maintenance and Rehabilitation Services

Physical Address View project details and contacts
City, State (County) Palm Bay, FL   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Palm Bay is requesting bids for Well Repair, Maintenance and Rehabilitation Services for the City of Palm Bay Utilities Department. Equipment will primarily be from water wells; however, repair services may be requested for various other pumps, motors and other miscellaneous equipment from the water and wastewater plants.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents