Similar Projects
Construction Manager - Freudenthal Library - TSC
Renovation
Bidding
Trinidad, CO 81082

Construction Services Trades from Certified Business
Term Contract
Post-Bid
CO

Nurses Station addition at Campus in the Keystone Resort Area
Addition
Post-Bid
Keystone, CO

North Boulder Library
New Construction - 10,718 SF
Results
Less than $8,000,000 est. value
Boulder, CO 80304

French Field Press Box Remodel Project
Renovation
Results
$150,000 to $200,000 est. value
Fort Collins, CO 80526

Centauri High School Requirement Early Site and Utilities Package Project
Construction
La Jara, CO 81140

Evergreen Middle School Renovation and General Upgrades
Renovation
Construction
Evergreen, CO 80439

Security Vestibules, District Wide, Package 2 - OHS Feeder Sites
New Construction
Post-Bid
Aurora, Denver, CO 80014

Poudre River Public Library Architectural Design Services
Results
Fort Collins, CO

Security Vestibules, District Wide, Package 3 - SHHS Feeder
New Construction
Post-Bid
Aurora, CO 80013

Architectural Design Services for Clifton Capital Project
Addition
Results
CO

Security Vestibules, District Wide, Package 1 - CCHS Feeder Sites
New Construction
Post-Bid
$1,125,000 est. value
Greenwood Village, CO 80111

Reed Library Academic Hub Phase 2
Renovation - 3,400 SF
Results
$200,000 est. value
Durango, CO 81301

LIBR- East and West Entries - Renovations
Renovation
Post-Bid
$490,000 est. value
Boulder, CO 80302

Standley Lake High School Renovation and Addition
Renovation, Addition
Results
$5,000,000 to $6,000,000 est. value
Westminster, CO 80021

Reported 04/27/2022 12:46 PM
Project Title

Aurora Public Schools 2022 Pre-Qualifying General Contractors

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Education
Sub-Category(s) Library - School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-qualifying General Contractors for 2022 upcoming projects including but not limited to: New Construction, Remodel and Other Projects.

Details

Library - School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents