Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Bethlehem Baptist Church
New Construction - 55,000 SF
Design
$25,000,000 est. value
Mansfield, TX

Sweeping and Debris Removal Highway:IH0020
Post-Bid
$429,088 est. value
Fort Worth, TX

Water Line Improvements for Kings Avenue, Westchester Drive and East Belknap Street
Post-Bid
$490,700 est. value
Haltom City, TX 76117

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Waterline Improvements for 3rd Street (North Road to Cory A Edwards Drive)
Results
$444,000 est. value
Kennedale, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Pending Verification
$12,862,400 CJ est. value
Fort Worth, TX 76109

Lake Street Between Pond Street and Tarrant Street, Drainage and Water Improvements
Post-Bid
$186,300 est. value
Mansfield, TX 76063

Preventive Maintenance
Results
$3,233,923 est. value
TX

The Watercress Amenity Center & Site Development
New Construction
Construction
Haslet, TX 76052

Bear Creek Intermediate School Sidewalk Improvements
Post-Bid
Keller, TX 76248

Westside 2 to Westside 3 Pressure Plane Transfer
Results
Fort Worth, TX

Last Updated 08/12/2022 09:02 AM
Project Title

Sanitary Sewer Rehabilitation, Contract 113, Part 4

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76102   (Tarrant County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Maintenance, Paving/Reconstruction, Plumbing, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction project consists of the replacement of 1,290 linear feet of 8-inch water pipe, 1,223 linear feet of 8-inch sanitary sewer pipe by open cut, and 1,336 linear feet of 8-inch sanitary sewer pipe by other than open cut. The areas are: along Hulen Sreet. from Wilton Drive to Wheelock Drive along Altamesa Boulevard near Vega Drive, the intersection of North Wedgemont Circle and Winifred Drive at Misty Meadows Drive South between Santa Rita Drive and Holly Springs Drive. Proposed water improvements include the removal and replacement of one fire hydrant and 14 1-inch water services including permanent asphalt pavement repair. Proposed sanitary sewer improvements include the replacement of 11 4-inch sewer services, ten 4-inch sewer service reinstatements and 15 4-foot diameter sanitary sewer manholes including permanent asphalt and concrete pavement repairs. Proposed pavement improvements include a 2-inch minimum mill and overlay (MOL) of approximately 3,333square yards of asphalt pavement along with the removal and replacement of 1,060 linear feet of 6-inch concrete curb and gutter, 5,000 square feet of 4-inch sidewalk and 2,000 square feet of 6-inch concrete driveway. The major work will consist of the (approximate) following: UNIT 1: Water Improvements: 1,290 LF of 8-inch water pipe by open cut 14 EA 1-inch water services 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,290 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 2: Sanitary Sewer Improvements: 1,263 LF of 8-inch sanitary sewer pipe by open cut 1,278 LF of 8-inch sanitary sewer pipe by pipe enlargement 15 EA 4-foot diameter sanitary sewer manholes 1 EA 4-foot diameter shallow manhole 11 EA 4-inch sewer services 10 EA 4-inch sewer service reinstatements (pipe enlargement) 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,303 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 3: Paving Improvements: 1,667 SY of 2" surface milling (MOL) (50/50) 1,667 SY of 2" asphalt pavement Type D (MOL) (50/50) 500 LF of 6" Concrete Curb and Gutter (50/50) 1,000 SF of 6-inch concrete driveway (50/50) The City's Business Equity goal on this project is 15% of the total bid value of the contrac

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents