Similar Projects
Last Updated | 08/12/2022 09:02 AM |
Project Title | Sanitary Sewer Rehabilitation, Contract 113, Part 4 |
Physical Address | View project details and contacts |
City, State (County) | Fort Worth, TX 76102 (Tarrant County) |
Category(s) | Heavy and Highway, Sewer and Water, Single Trades |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Plumbing, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction project consists of the replacement of 1,290 linear feet of 8-inch water pipe, 1,223 linear feet of 8-inch sanitary sewer pipe by open cut, and 1,336 linear feet of 8-inch sanitary sewer pipe by other than open cut. The areas are: along Hulen Sreet. from Wilton Drive to Wheelock Drive along Altamesa Boulevard near Vega Drive, the intersection of North Wedgemont Circle and Winifred Drive at Misty Meadows Drive South between Santa Rita Drive and Holly Springs Drive. Proposed water improvements include the removal and replacement of one fire hydrant and 14 1-inch water services including permanent asphalt pavement repair. Proposed sanitary sewer improvements include the replacement of 11 4-inch sewer services, ten 4-inch sewer service reinstatements and 15 4-foot diameter sanitary sewer manholes including permanent asphalt and concrete pavement repairs. Proposed pavement improvements include a 2-inch minimum mill and overlay (MOL) of approximately 3,333square yards of asphalt pavement along with the removal and replacement of 1,060 linear feet of 6-inch concrete curb and gutter, 5,000 square feet of 4-inch sidewalk and 2,000 square feet of 6-inch concrete driveway. The major work will consist of the (approximate) following: UNIT 1: Water Improvements: 1,290 LF of 8-inch water pipe by open cut 14 EA 1-inch water services 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,290 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 2: Sanitary Sewer Improvements: 1,263 LF of 8-inch sanitary sewer pipe by open cut 1,278 LF of 8-inch sanitary sewer pipe by pipe enlargement 15 EA 4-foot diameter sanitary sewer manholes 1 EA 4-foot diameter shallow manhole 11 EA 4-inch sewer services 10 EA 4-inch sewer service reinstatements (pipe enlargement) 833 SY of 2" surface milling (MOL) (50/50) 833 SY of 2" asphalt pavement Type D (MOL) (50/50) 1,303 LF of 5' wide asphalt pavement repair 250 LF of 6" concrete curb and gutter (50/50) 500 SF of 6-inch concrete driveway (50/50) UNIT 3: Paving Improvements: 1,667 SY of 2" surface milling (MOL) (50/50) 1,667 SY of 2" asphalt pavement Type D (MOL) (50/50) 500 LF of 6" Concrete Curb and Gutter (50/50) 1,000 SF of 6-inch concrete driveway (50/50) The City's Business Equity goal on this project is 15% of the total bid value of the contrac |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |