Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

Carbon Canyon Water Recycling Facility (CCWRF) Asset Management and Improvements Project
Infrastructure, Renovation
Bidding
$25,500,000 CJ est. value
Chino, CA 91710

O.P.D. Locker and Gym Expansion
Addition, Demolition, Infrastructure
Bidding
$1,300,000 CJ est. value
Ontario, CA 91761

O'Reilly Auto Parts (CL2) / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

District Wide HVAC Replacements 11 Campuses (COVID) - General Construction
Renovation
Results
$250,000 est. value
Hesperia, CA 92344

CA FTNP MOJA 12(1) Cima Road Project
Infrastructure
Results
$27,227,000 CJ est. value
Cima, CA 92364

Chino HS Reconstruction Phase II
Renovation
Construction
Chino, CA 91710

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Last Updated 12/21/2022 03:03 AM
Project Title

Existing Canopy Removal and Underground Conduit Installation at Sequoia Middle School

Physical Address View project details and contacts
City, State (County) Fontana, CA 92335   (San Bernardino County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,536,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 19,2022, the District's decision to reject all bids and rebid this project. At this moment there's no exact date/time frame of when the project will rebid. Existing Canopy Removal and Underground Conduit Installation at Sequoia Middle School (Includes Disconnecting/reconnecting Notifier Fire Alarm and Bosch Security/camera Systems) The last day to be approved through PQ Bids is March 25, 2022, at 5:00PM. This pre-qualification is mandatory for all prospective bidders to be considered; bidders that do not meet these deadlines will be deemed as non-responsive. Once the bidder is final approved through PQ Bids, they will be approved for one (1) year from the final approval date. It is and will be the bidder's sole responsibility to stay updated and approved in the PQ Bids system. The District has no responsibility to contact contractors to apply, renew or update information in the PQ Bids system. Any questions or technical support inquiries in submitting the required documents may be directed to PQ BIDS at info@pqbids.com or by calling 888-218-4173. (NOTE: Use the questionnaire type: AB2031-Projects over $1,000,000.00, Agency Name: Fontana Unified to pre-qualify on the PQ Bids website). All requests for information must be submitted, in writing, to Brandy Cuttress, Director of Purchasing, via email at brandy.cuttress@fusd.net and received no later than 4:00 p.m. on November 30, 2022. Please direct all correspondence with the subject line, "Bid No. 22/23-1630 Canopy & Underground Project". No other questions or requests for information will be accepted after this date and time. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code and be licensed to perform the work called for in the contract documents. The successful bidder must possess a valid and active Class B License at time of bid and license must be valid through project completion. The Contractor California State License number shall be clearly stated on the Bid Form. In addition, successful bidder OR designated subcontractor must possess a valid C10 license and be manufactured-certified as an Authorized Notifier Partner. Each bidders bid must be accompanied by one of the following forms of bidder security: (1) cash; (2) a cashier check made payable to the DISTRICT; (3) a certified check made payable to the DISTRICT; or (4) a bidders bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the DISTRICT in the form set forth in the contract documents. Such bidder security must be in an amount not less than five percent (5%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds and insurance certi Separate payment and performance bonds, each in an amount equal to 100% of the total contract amount, are required, and shall be provided to the DISTRICT prior to execution of the contract and shall be in the form set forth in the contract documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents