Similar Projects
Well #3A Submersible Motor Replacement
Results
Less than $18,000 est. value
Needham, MA

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Bidding
$125,000 est. value
Boston, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Drinking Water Supply Well Rehabilitation
Results
$45,000 est. value
Bellingham, MA

Muddy Pond Replacement Wells and Pump Station
Results
$3,000,000 est. value
Stoughton, MA

Oak Street Replacement Wells 7R, 9R, and 10R
Results
Less than $815,000 est. value
Foxborough, MA 02035

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Sub-Bidding
$8,400,000 est. value
Medfield, MA 02052

Cleaning and Redevelopment of the Town's Seven Wells
Term Contract
Results
Stoughton, MA 02072

Emergency Repair of Submersible Motor at Well 6
Post-Bid
Foxborough, MA 02035

Installation of two New Drinking Water Wells
Results
Less than $700,000 est. value
Plainville, MA

Public Water Drinking Well Installation
Results
Plainville, MA

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Wells 3 and 4 Water Treatment Plant - General Bids
Bidding
$8,400,000 est. value
Medfield, MA 02052

Reported 09/01/2020 12:00 AM
Project Title

Backwash Pump VFD Project

Physical Address View project details and contacts
City, State (County) Walpole, MA 02081   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 08/28/20
Owner View project details and contacts
Architect View project details and contacts
Description

To change the backwash pumps at the EJD WTF from constant speed / valve throttling operation to VFD control. Initially these pumps will ramp from 0 to 60Hz until such time as the FCP HMI is modified to allow for flow based control of the backwash pumps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents