Similar Projects
Multiple I-25 on - Ramps Between MM 148 and MM 158
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
CO

Black Forest Roadway Improvements - Woodmen Road to Research Parkway CM Services
Infrastructure
Bidding
Colorado Springs, CO 80902

Falcon Highlands Maintenance Project
Post-Bid
Colorado Springs, CO 80903

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

2020 Pavement Resurfacing Project
Results
Fountain, CO 80817

Laying Asphalt Paving Material
Term Contract
Results
CO

Manitou Avenue Paving from El Paso to Ruxton
Post-Bid
Manitou Springs, CO 80829

CO FTBR Crystal Dam (1), East Portal Access Road
Results
$4,500,000 to $5,500,000 est. value
CO

Grinnell Boulevard and Fontaine Boulevard Intersection Improvements
Post-Bid
CO

Two-Inch Mill And Overlay Of On/Off Ramps At Four Interchanges In The Colorado Springs Area
Results
$1,000,000 to $5,000,000 est. value
CO

2C Extension Pre-Overlay Concrete
Post-Bid
Colorado Springs, CO 80903

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2C Extension Asphalt Overlay
Post-Bid
Colorado Springs, CO

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Last Updated 10/20/2021 12:28 PM
Project Title

Street Improvements (Paving)

Physical Address View project details and contacts
City, State (County) Manitou Springs, CO 80829   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill and overlay of several streets in Manitou Springs. The Anticipated Scope of Services will include the following: 1. The Contractor will provide a written Schedule for the work to be completed to the City as described at the Pre Construction Meeting and needs to be included in bid package. 2. All streets will be milled to a minimum depth of 2”, and the overlay will be a minimum of 2” in depth. a. Chelton Road, approximately 23,100 square feet b. Spur Road, approximately 4,500 square feet c. Short Road, Approximately 8,625 square feet d. Fountain Place, approximately 7,200 square feet e. 6-inch asphalt curb placed on Chelton Road, Approximately 105 linear feet f. 6-inch asphalt curb placed on Spur Road, approximately 195 linear feet g. 6-inch asphalt curb placed on Fountain Place Road, approximately 194 linear feet h. One foot wide/1 1/2-inch depth asphalt storm water pan placed on Short Road, approximately 230 linear feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents