Similar Projects
Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Bidding
Tuscaloosa, AL

Crenshaw Street Lift Station and Force Main Upgrades
New Construction, Infrastructure
Bidding
Mobile, AL 36606

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

South Parkway Raw Water Pump Station Improvements
Results
Less than $2,294,106 est. value
Huntsville, AL 35804

Jones Road Pump Station Upgrade and Gravity Sewer
Results
Athens, AL 35613

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Magnolia Grove Lift Station and Force Main
New Construction, Infrastructure
Bidding
Mobile, AL

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

Cherry Tree Booster Pump Station
Results
Less than $370,751 est. value
Huntsville, AL 35801

Contract No. 1 - 600 GPM Booster Pump Station
New Construction
Bidding
$375,000 est. value
Sardis City, AL

Lagoon Park Golf - New Pump Station
Post-Bid
$130,000 to $145,000 est. value
Montgomery, AL 36109

Gin Shop Lift Station Improvements
Results
Prattville, AL

Repair Of Sewage Lift Station
Term Contract
Bidding
Montgomery, AL 36108

Contract No. 2 - Laney Lift Station Upgrade of the Tallassee WWTP and Collection System Improvements
Post-Bid
Tallassee, AL 36078

Reported 01/13/2022 01:50 PM
Project Title

Newfound Creek No. 1 and No. 2 Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the rehabilitation of two (2) wastewater pumping stations including but not limited to demolition of existing pumping station piping and equipment, installation of piping, valves, pumps, electrical components, conduit, wiring, and other appurtenances as necessary, and other miscellaneous facility and site improvements. Work also includes the repair of existing pumps and site improvements the Cottages at Fieldstown pumping station.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents