Similar Projects
Reported | 12/07/2021 10:44 AM |
Project Title | J061--Fy22: LCHCC Generator Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Cape Coral, FL 33909 (Lee County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Perform general maintenance, repair, testing, and operation in accordance with the Manufacturers recommended guidelines and these specifications. Where conflicts exist the most stringent application will apply. Work shall be performed on the following systems and their associated equipment: Three Generators: MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-3-0510 Rm 2B197 MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-2-0410 Rm. 2B197 MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-1-0410 Rm. 2B197 43 EA GE BREAKERS: 04 EA ENTELLIGUARD Cat No. GA32M1HEMXX4CLXL3Z62 03 EA POWERBREAK II Cat No. SSD40G440 18 EA WAVEPRO WPF-08 Cat No. WSKD3P9XXXBBXXX 18 EA SPECTRA RMS I UNIT GE Generator and Load Control Switchgear: Serial Number 1585256 1 EA Uninterruptable Power Supply: SG 150 Serial Number P0505-4710-B135P 17 Automatic Transfer Switches: 16 EA GE Cat No. Z20K4S1AB70XDE4XXS 1 Fire Pump ATS Cat No. FTA900-Al260B, SERIL NO. 615988-01RE 1 Power Management Control System (PMCS) In addition to the associated equipment outlined by these specifications the Contractor shall be responsible for ensuring fuel quality for this contract. These requirements include but are not limited to the following: two 25,000-gallon Fuel Tanks, three 450-gallon day tanks, and one Fuel Polishing system and all associated piping. 4 quarterly fuel quality samples for each primary and each day tank. 2 Semi Annual Fuel polishing for each of the primary and secondary day tanks. Any damages resulting from poor fuel quality shall be the sole responsibility of the Contractor. Copies of fuel quality reports shall be presented to the COR within 24 hours of results. Copies of all other required logs shall be provided within a maximum seven calendar days from date of test. All other mandatory compliance requirements. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |