Similar Projects
Reported 12/07/2021 10:44 AM
Project Title

J061--Fy22: LCHCC Generator Maintenance

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33909   (Lee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform general maintenance, repair, testing, and operation in accordance with the Manufacturers recommended guidelines and these specifications. Where conflicts exist the most stringent application will apply. Work shall be performed on the following systems and their associated equipment: Three Generators: MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-3-0510 Rm 2B197 MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-2-0410 Rm. 2B197 MTU Detroit,1500KW, Model1500RXC6DT2, SN 320312-1-1-0410 Rm. 2B197 43 EA GE BREAKERS: 04 EA ENTELLIGUARD Cat No. GA32M1HEMXX4CLXL3Z62 03 EA POWERBREAK II Cat No. SSD40G440 18 EA WAVEPRO WPF-08 Cat No. WSKD3P9XXXBBXXX 18 EA SPECTRA RMS I UNIT GE Generator and Load Control Switchgear: Serial Number 1585256 1 EA Uninterruptable Power Supply: SG 150 Serial Number P0505-4710-B135P 17 Automatic Transfer Switches: 16 EA GE Cat No. Z20K4S1AB70XDE4XXS 1 Fire Pump ATS Cat No. FTA900-Al260B, SERIL NO. 615988-01RE 1 Power Management Control System (PMCS) In addition to the associated equipment outlined by these specifications the Contractor shall be responsible for ensuring fuel quality for this contract. These requirements include but are not limited to the following: two 25,000-gallon Fuel Tanks, three 450-gallon day tanks, and one Fuel Polishing system and all associated piping. 4 quarterly fuel quality samples for each primary and each day tank. 2 Semi Annual Fuel polishing for each of the primary and secondary day tanks. Any damages resulting from poor fuel quality shall be the sole responsibility of the Contractor. Copies of fuel quality reports shall be presented to the COR within 24 hours of results. Copies of all other required logs shall be provided within a maximum seven calendar days from date of test. All other mandatory compliance requirements.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents