Similar Projects
Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Sleepy Eye, MN 56085

Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Sleepy Eye, MN 56085

Construction of a National Guard Readiness Center 21-01 - Minnesota Department of Military Affairs
New Construction, Infrastructure
Design
$17,245,000 CJ est. value
New Ulm, MN 56073

North Highland Ave. and North Broadway Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
New Ulm, MN 56073

North Highland Ave. and North Broadway Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
New Ulm, MN 56073

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

20th South Street Reconstruction Project
Infrastructure
Post-Bid
New Ulm, MN 56073

Grading and Riprap
Infrastructure
Results

Mill and Overlay, Cold in Place Recycle, Lighting, Pedestrian Crosswalk Flasher System, Snow Fence, and ADA Improvements 8.423 Miles
Infrastructure
Results

Wet Corn Bin and Storage Building
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
New Ulm, MN 56073

Roundabout Construction - TH 14
Infrastructure
Conception
$2,400,000 CJ est. value
New Ulm, MN 56073

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

CSAH 13 (Boundary Street) New Alignment
Infrastructure
Results
$4,876,835 est. value
New Ulm, MN 56073

Last Updated 03/31/2023 05:09 PM
Project Title

CSAH 20 FDR and Overlay Between CSAH 13 and TH 15

Physical Address View project details and contacts
City, State (County) New Ulm, MN 56073   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,037,615 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 31, 2023, project was awarded to Minnesota Paving & Materials, awarded amount is $6,037,614.99.** S.A.P. 008-620-034 Full Depth Reclamation, Bituminous Surfacing and Aggregate Shoulders on CSAH 20 located between CSAH 13 and TH 15 Major quantities include: 1,388 L.F. Remove Guardrail; 22,975 Tons Aggregate Shoulder Class 1; 10,920 S.Y. Mill Bituminous Surface; 69,870 S.Y. Full Depth Reclamation; 154,170 L.F. Mill Rumble Strips; 211,790 S.Y. Cold Inplace Recycle; 1,283 Tons Bituminous Material For Mixture CIR-EE; 30,060 Gal. Bituminous Material for Tack Coat; 59,010 Tons Wearing Course Mixture; 1,500 Tons Bituminous Mix Production; 915 S.F. Concrete Sidewalk; 138 L.F. Concrete C&G Design B618; 1,388 L.F. 3-Cable Guardrail; 8 Each Anchorage Assembly-Cable; 6 L.S. Traffic Control; 258,500 L.F. 4 Inch Striping and 144 L.F. 24 Inch Solid Line Preform Tape Ground In - White. A bidder's bond or a certified check payable to the Treasurer of Brown County in the amount of at least 5% of the total amount bid must be included. Brown County reserves the right to reject any or all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents