Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

CMAQ Sidewalk Improvements
Post-Bid
Claremont, NC

Rockingham Community College Parking Lot Restriping and Patching
Post-Bid
Wentworth, NC 27375

Driveway Repairs for Durham County Fire Stations
Results
Durham, NC

Sunset Streetscape Improvements
Results
Blowing Rock, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

Haywood Streetscape
Results
Less than $4,749,345 est. value
Asheville, NC

West Water Street Parking Lot Expansion
Post-Bid
Lincolnton, NC

Wilson Street Sidewalk
Results
Wingate, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

Poston Park ADA Trail
Post-Bid
Lowell, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

Edgewood Road Parking Lot
Results
Asheville, NC 28804

Last Updated 01/18/2021 01:50 PM
Project Title

Goldleaf Street Pedestrian Crossing

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27802   (Edgecombe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

work shall consist of the installation of approximately 330 LF of 5’ wide concrete sidewalk, accessible ramps, and painted crosswalk along both sides of Goldleaf Street at its existing at-grade rail crossing (approximately 220 LF sidewalk total in CSX ROW), all in accordance with the plans and specifications and attached Scope of Work and Project Specific Notes prepared by Appian Consulting Engineers, PA. Scope of work also includes but not limited to demolition of existing curb/gutter and installation of a new storm drainage box, culvert and asphalt paving. No utility work, pipelines, wirelines or other underground work is proposed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents