Similar Projects
New Wastewater Treatment Plant
New Construction
Design
$46,000,000 est. value
Charlestown, IN

North WRF Expansion
Addition
Bidding
$1,500,000 est. value
Jeffersonville, IN 47130

Wastewater Treatment Plant Improvements
New Construction
Bidding
$300,000 est. value
Greenfield, IN

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

Peak Excess Flow Treatment Facility
Post-Bid
Kokomo, IN

WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and Disinfection
Results
South Bend, IN 46628

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

Boone Grove High School - New Wastewater Treatment Plant
New Construction
Bidding
$650,000 est. value
Valparaiso, IN 46385

West WWTP Renewable Natural Gas (RNG) System
Post-Bid
Evansville, IN

WWTP Rehabilitation and Expansion
Results
Sellersburg, IN

Phosphorus Removal Chemical Building
Addition
Post-Bid
Linton, IN

Wastewater Utility Improvements
New Construction
Results
$425,929 est. value
Versailles, IN

Waste Water Treatment Plant Capacity Upgrades – Phase 2
New Construction
Post-Bid
Elkhart, IN

Phosphorus Removal Upgrades
Results
Spencer, IN

WTP Chemical Feed Building Addition and Lift Station Improvements
Addition
Post-Bid
Loogootee, IN

Last Updated 05/17/2022 05:52 AM
Project Title

2022 Wastewater Utility Improvements Project

Physical Address View project details and contacts
City, State (County) Ridgeville, IN 47380   (Randolph County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will include improvements to both the Wastewater Treatment Plant and the Collection System. The Wastewater Treatment Plant improvements will include lift station improvements, replacement of piping in existing wastewater treatment facility, replacement of blowers, replacement of diffusers, sludge dewatering system improvements, construction of new lab and chemical building, modification of yard piping to accommodate improvements. Collection System Rehabilitation will consist of modifications to the Waltz Street Lift Station, replacement of manholes, lining of manholes, CIPP of collection system lines, etc. In addition to these items of work there are other miscellaneous items of work necessary to and as specified to make the Project complete.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents