Similar Projects
Northwoods Boulevard Warehouse
New Construction, Infrastructure - 1,050,000 SF
Conception
$113,400,000 CJ est. value
Vandalia, OH 45377

Northwoods Boulevard Warehouse
New Construction, Infrastructure - 1,050,000 SF
Conception
$113,400,000 CJ est. value
Vandalia, OH 45377

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

2022 CDBG Alley Asphalt Resurfacing
Infrastructure
Bidding
$225,000 CJ est. value
Dayton, OH 45402

2022 CDBG Alley Asphalt Resurfacing
Infrastructure
Bidding
$225,000 CJ est. value
Dayton, OH 45402

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Sheldon Water Main Replacement
Post-Bid
$1,004,792 est. value
OH

2020 Large Valve Rehabilitation
Results
Dayton, OH 45402

Rosa Parks School Parking Lot Expansion
Results
Dayton, OH 45402

Carriage Trails Phase VII
New Construction, Infrastructure
Pending Verification
$19,565,000 CJ est. value
Huber Heights, OH 45371

Carriage Trails Phase VII
New Construction, Infrastructure
Pending Verification
$19,565,000 CJ est. value
Huber Heights, OH 45371

Bridge Preservation
New Construction, Demolition, Infrastructure
Design
$343,000 est. value
Riverside, OH 45431

Stubbs Park Playground Replacement
Infrastructure
Bidding
$70,000 CJ est. value
Centerville, OH 45458

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Last Updated 08/02/2022 10:07 AM
Project Title

Whispering Crossover Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) Trotwood, OH 45426   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK to be performed under this improvement shall generally consist of the replacement of an existing 10" sewer to eliminate a series of 90-degree bends within The City of Trotwood limits. Work includes removal and replacement of manholes and sewers, restoration of walks and driveways, removal and resetting fences and trench restoration in grass and pavement. Service laterals will be reconnected, and the project will require bypass pumping. 1.3 THE ABOVE IMPROVEMENT shall be in accordance with the Contract Documents. The City of Trotwood reserves the right to reject any or all bids in accordance with the Contract Documents. The City of Trotwood reserves the right to add to or to subtract from the contract quantities. The City of Trotwood also reserves the right to hold all proposals for sixty (60) days. EACH BIDDER is required to furnish with its proposal, a Bid Guaranty (10% of the Bid Amount) and Contract Bond (100% of the Bid Amount) in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. 1.6 EACH PROPOSAL must contain the full name of the party or parties submitting the proposal and all persons interested therein. All legal forms in bid book should be used and/or acknowledged when submitting a bid including all required Community Development Block Grant (CDBG) forms. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services and labor in the implementation of the project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required, as well as Executive Order 11246 as amended. Federal requirements for MBE/WBE and Section 3 utilization goals shall apply with Montgomery County, Ohio's goals being 11.5% for MBE participation and 6.9% for WBE. A good faith effort must be Documented. 1.7 BIDDERS must comply with Federal Labor Standards Provisions including the Davis-Bacon Prevailing Wage Rates on Public Improvements, as determined by the U.S. Department of Labor federal regulations.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents