Similar Projects
Disaster Debris Monitoring Services
Term Contract
Post-Bid
Gainesville, FL 32606

Waste Management Services
Term Contract
Post-Bid
Pensacola, FL 32514

Processing and Disposal of Waste Tire Management Services
Term Contract
Results
Brooksville, FL 34601

Single Stream Recycling
Term Contract
Results
Inverness, FL 34450

Derelict Vessel Removal
Post-Bid
FL

Pump, Transport, and Dispose of Leachate and Effluent to County Sites
Results
Less than $22,952,160 est. value
Tampa, FL 33601

Vegetative Debris Grinding and Disposal Services
Term Contract
Post-Bid
Tavares, FL 32778

Remove Debris
Results
Less than $25,000 est. value
Chattahoochee, FL

Transportation and Recycling of Obsolete Electronic Equipment
Post-Bid
Tallahassee, FL

Annual Wood Waste Processing
Term Contract
Results
Less than $35,000 est. value
Gainesville, FL 32601

National Forest Timber Sale Ocala National Forest - Tiger Shark Sale
Post-Bid
Ocala, FL

Lime Slurry Removal
Term Contract
Results
Titusville, FL 32781

Diasater Debris Removal and Disposal Services
Term Contract
Post-Bid
Okeechobee, FL 34972

Hillsboro Beach Renourishment Project
Results
Hillsboro Beach, FL 33062

Lime Sludge Loading, Hauling and Disposal of
Term Contract
Post-Bid
West Palm Beach, FL 33467

Reported 07/28/2021 12:00 AM
Project Title

Well Done 21/22 Timber Sale

Physical Address View project details and contacts
City, State (County) FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This sale is an operator select thinning of approximately 1,127 acres from three different Brevard County properties located in Brevard County, Florida. Unit one is located on Malabar Scrub Sanctuary and consists of mature natural scattered slash pines with some sand pines as well. Trees will be thinned leaving one to two trees per acre. Units two and three are located on Micco Scrub Sanctuary. Units two and three consist of mature planted slash pines. The current tree density is100 basal area. Trees will be thinned down to 40 to 50 basal area. Unit four is located on Grant Flatwoods Sanctuary. Unit four consists of mature natural slash and longleaf pines at a density of 120 basal area. Trees will be thinned down to 40 to 50 basal area. Leave trees in all units should be healthy, good formed trees and not be damaged by harvesting operations. Loggers should favor longleaf pines, flat-topped and turpentine trees as leave trees. Units two, three and four will also have a clear-cut of all pines located within 20 feet of the existing firelines and roads. Pines with a DBH of 16 inches or greater will not be harvested. Boundaries are natural stand changes, roads, firelines, trails, and utility right of ways. Access to Unit one is off Malabar Road. Access to Units two, three and four is off Micco Road. There is no estimation of volumes for this sale. This will be a twelve (12) month contract.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents