Similar Projects
Boardwalk Reconstruction at the Great Swamp Outdoor Education Center
Infrastructure
Bidding
$230,000 est. value
NJ 07928

2020 Bulkhead Repair Project
Infrastructure
Bidding
$700,000 est. value
Toms River, NJ

Reconstruction of Various Bulkhead
Post-Bid
Avalon, NJ 08202

Building Operation and Maintenance Services
Term Contract
Post-Bid
Jersey City, NJ

Secaucus Duck Pond Revitalization and Preservation
Results
Secaucus, NJ 07094

Boat for Marine Field Station
Results
Galloway, NJ

Stewart Lake Park Pedestrian Path Phase 1
Infrastructure, Alteration
Post-Bid
Woodbury, NJ

Horseshoe Lake Dock Replacement
Results
Ledgewood, NJ

Country Club 2022 Boardwalk Restoration
Alteration
Post-Bid
Lake Mohawk, NJ 07871

Installation and Removal of Docks at the Mercer County Arm and Hammer Park
Term Contract
Results
Trenton, NJ

Ocean Outfall Riser Inspection and Diffuser Replacement at Various Locations
Term Contract
Post-Bid
$441,000 est. value
NJ

Beach Way Outfall Improvements
Results
Sea Bright, NJ

Cathodic Protection System Repairs
Infrastructure
Post-Bid
$700,000 est. value
Camden, NJ

Repairs on Cement Dock
Results
Perth Amboy, NJ 08861

Bulkhead Replacement - Leonardo State Marina
Infrastructure
Post-Bid
$6,294,717 est. value
Leonardo, NJ 07737

Last Updated 06/27/2022 08:50 AM
Project Title

Boardwalk Decking Removal and Replacement Project

Physical Address View project details and contacts
City, State (County) Asbury Park, NJ 07712   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The city of Asbury Park is soliciting bids from qualified contractor to remove and replace existing wood decking on our boardwalk: North Section (from Convention Hall to 7th Avenue) which has an approximated width of 53.3’(avg.) and a length of approximately 600’ (an area of 32,000 sq. ft. +/-) and South Section (from Asbury Avenue, to Convention Hall) which has an approximated width of 50.0’(avg.) and a length of approximately 775’ (an area of 38,750 sq. ft. +/-). Total square feet is approximately 70,750 Sq. ft. +/- in this contract, as specified by the Director of Public Works.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents