Similar Projects
Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

McInernie Creek Culvert Project
Infrastructure
Bidding
$200,000 est. value
Martin City, MT

Giant Springs Hatchery Settling Pond Replacement
Infrastructure
Bidding
$230,000 est. value
Great Falls, MT 59405

Lake Elmo C Fluminea Eradication
Infrastructure
Post-Bid
$494,506 est. value
Billings, MT 59105

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Lake Elmo Dewatering Project
Infrastructure
Results
Billings, Helena, MT 59105

Lake Elmo Dewatering Project
Infrastructure
Results
Billings, Helena, MT 59105

SF189 D2 HT Median Cable Rail
Infrastructure
Bidding
$1,600,000 to $2,000,000 est. value
Helena, MT

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Design Build - Bridger Creek Flood and Erosion Control Project
Infrastructure
Bidding
$250,000 est. value
Bozeman, MT

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

Milwaukee Roundhouse CECRA Facility Passenger Refueling Area (PRA) 2021 Soil Removal Action
Infrastructure
Post-Bid
Deer Lodge, MT

Grading, Gravel Surfacing, Plant Mix Surfacing, Bridge Replacement, Guardrail installation, Drainage, Signing and Pavement Markings
New Construction, Infrastructure
Results
MT

Reported 06/18/2022 12:00 AM
Project Title

Cutler Lake Trail #284

Physical Address View project details and contacts
City, State (County) Bozeman, MT   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION AND LOCATION (a) - Scope of Contract. Construct approximately 5 miles of stock trail. Work generally includes clearing and new trail construction, construction ofswitchbacks and rock wall, reconditioning of existing tread, culvert installation, obliteration of existing trail, installation of drainage structures, post and sign installation, and other miscellaneous trail work. Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01). (b) - Project Location. The project is located within the Gallatin Mountain range Southeast of Bozeman, MT. From Bozeman, follow Interstate I90 east for 25 miles to Livingston. Follow Highway 89 south for 46 miles to Corwin Springs. Turn right or west on Cinnabar Basin road and cross the bridge and Yellowstone River. Turn right or north on Old Yellowstone road, and follow north for approximately 5 miles, while keeping right at intersections, to the pullout/trailhead on the right, .5 miles before Cutler Lake. Project begins at the gate on old road heading west

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents