Similar Projects
Last Updated | 09/30/2021 05:04 PM |
Project Title | Water SCADA System Development |
Physical Address | View project details and contacts |
City, State (County) | Edison, NJ (Middlesex County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Security/Communications, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work generally consists of the construction of the new SCADA system. The installation of equipment for the SCADA system. This includes but is not limited to selective demolition at the Suttons Lane water meter chamber, including the equipment and controls such as the control, panel, power panel board, and electric utility meter. The work will also include the installation of a new goose neck air vent to the meter chamber, lock bar mechanism for the hatch and new electrical cable and conduit and the replacement of the control, panel, power panel board, and electric utility meter. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |