Last Updated 09/30/2021 05:04 PM
Project Title

Water SCADA System Development

Physical Address View project details and contacts
City, State (County) Edison, NJ   (Middlesex County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Security/Communications, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the construction of the new SCADA system. The installation of equipment for the SCADA system. This includes but is not limited to selective demolition at the Suttons Lane water meter chamber, including the equipment and controls such as the control, panel, power panel board, and electric utility meter. The work will also include the installation of a new goose neck air vent to the meter chamber, lock bar mechanism for the hatch and new electrical cable and conduit and the replacement of the control, panel, power panel board, and electric utility meter.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents