Similar Projects
Hoots Wings
Build-Out - 2,400 SF
Conception
McKinney, TX

Fuzzy's Taco Shop
Build-Out
Conception
Anna, TX

Wendy's #10650 / McKinney
Renovation - 3,038 SF
Design
Less than $200,000 est. value
McKinney, TX 75070

Black Rock Coffee
Renovation - 2,000 SF
Design
$300,000 est. value
McKinney, TX

Monarch Hike and Bike Trail
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Frisco, TX

Bethany Lakes Loop Trail
Infrastructure
Bidding
$300,000 est. value
Allen, TX 75002

Swig (T.I.) / Celina
Renovation - 1,360 SF
Sub-Bidding
$212,160 est. value
Celina, TX 75078

Arby's
New Construction - 2,332 SF
Post-Bid
$450,000 est. value
McKinney, TX 75070

Hawaiian Bros.
Renovation - 4,000 SF
Post-Bid
Murphy, TX 75094

Sidewalk Improvements - Plano Parkway from Independence Parkway to Alma Drive Project
Results
Less than $3,440,000 est. value
Plano, TX

Concrete Sidewalk Requirement Contract West - 2021
Results
$1,500,000 est. value
Plano, TX

Braum's
New Construction - 4,900 SF
Construction
$900,000 est. value
McKinney, TX 75071

BoomerJack's Grill & Bar
New Construction - 9,371 SF
Construction
$1,200,000 est. value
Plano, TX 75024

Pete's Dueling Piano Bar
Renovation - 5,509 SF
Pending Verification
$150,000 est. value
Frisco, TX 75034

Starbucks - Tenant Improvement
Build-Out - 2,092 SF
Conception
Celina, TX 75009

Reported 07/14/2022 12:31 PM
Project Title

Freddy's Frozen Custard / Frisco

Physical Address View project details and contacts
City, State (County) Frisco, TX   (Collin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Obtained from a News Source, Construction Start Expected August 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a mixed-use development in Frisco, Texas. Working plans call for the construction of a 3,077-square-foot, one-story above grade restaurant; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. As of July 13, 2022, final design is underway. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin August 2022 and be completed November 2022. Site: Block A, Lot 20 SWC 423 & 380 Frisco, TX 75034 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, 3,077 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents