Similar Projects
Renovate Shower Room
Bidding
$35,000 est. value
Grafton, MA 01536

Paton Elementary School Ceiling Repair
Post-Bid
Less than $12,000 est. value
Shrewsbury, MA 01545

Annual On-Call Plastering, Drywall, and Carpentry Services
Term Contract
Post-Bid
Less than $40,000 est. value
Leominster, MA

Kitchen Cabinets & Flooring
Results
Less than $31,790 est. value
Milford, MA

Kitchen & Flooring Upgrades in 3 Units
Results
$18,000 est. value
Athol, MA 01331

Replace 4 Tubs With Roll-In Tubs In Accessible Units
Post-Bid
Less than $49,000 est. value
Gardner, MA

Roof and Wall Panel Replacement at the 89 Bancroft Street Maintenance Depot - General-Bid
Results
Less than $844,000 est. value
Auburn, MA 01501

Asbestos Abatement and Flooring and Ceiling Replacement
Post-Bid
Less than $115,000 est. value
Lunenburg, MA

Roof and Wall Panel Replacement at the 89 Bancroft Street Maintenance Depot - Sub-Bid
Results
Auburn, MA 01501

Kitchen & Bath Upgrades Phase 2
Post-Bid
Less than $13,000 est. value
Gardner, MA 01440

Bathroom Renovation
Results
$17,000 est. value
Spencer, MA 01562

QCC Administration Building Dental Clinic Glazed Screen System Installation Project
Post-Bid
Less than $28,000 est. value
Worcester, MA 01606

MA041 Toilet Room Renovation
Results
Less than $30,300 est. value
Shrewsbury, MA 01545

Replace Grid Ceiling and Lighting In Four Hallways of Haley Academic Building
Post-Bid
Less than $135,000 est. value
Gardner, MA 01440

Kitchen Cabinet Replacement
Results
$49,000 est. value
Southborough, MA 01772

Last Updated 10/14/2020 09:30 AM
Project Title

Unit Renovations Phase 3

Physical Address View project details and contacts
City, State (County) Gardner, MA 01440   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Replacement of kitchen cabinets and counters, abatement of ACM flooring, install new VCT in kitchen and bath, replacement of selected plumbing and electrical components, all in one vacant apartment.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation, Asbestos Abatement.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Gypsum Board, Wood Flooring, Resilient Flooring, Resilient Tile Flooring.
Division 22 - Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents